My WebLink
|
Help
|
About
|
Sign Out
Home
8P Consent 2011 0620
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2011
>
Packet 2011 0620
>
8P Consent 2011 0620
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2011 5:17:03 PM
Creation date
6/16/2011 4:35:24 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
6/20/2011
Retention
PERM
Document Relationships
_CC Agenda 2011 0620
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 0620
Reso 2011-119
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Annual Overlay /Rehab 2010 -11 <br />P &S, Call for Bids 2 June 20, 2011 <br />• Andover Street from Burkhart Avenue to Lewelling Boulevard <br />• Astor Drive from View Drive to Lake Chabot Road <br />• Begier Avenue from Chetland Road to Bancroft Avenue <br />• Pearson Avenue from Gilmore Drive to Valley Street <br />• Johnson Street from Leonard Drive to Gilmore Drive <br />• Valley Street from Pearson Avenue to Gilmore Drive <br />• Maria Drive from Leonard Drive to Johnson Street <br />In addition, a portion of the segment of Bancroft Avenue from San Leandro Creek to Callan <br />Avenue will be repaired to correct pavement defects due to trench settlement in the area. Also, <br />curb ramps will be replaced to meet current Americans with Disabilities Act (ADA) standards <br />and roadway striping will be replaced per City Standard Plans. <br />Applicable General Plan Policy <br />This action is consistent with Streets and Highway Goal No. 16 of the General Plan and Action <br />Item 16.03: Maintenance. <br />Code Compliance Review <br />California Environmental Quality Act (CEQA) exemption has been filed with Alameda County, <br />pursuant to Section 15301 "Existing Facilities ". <br />Fiscal Impact <br />The total construction cost including design, contingencies, construction management and <br />Americans with Disabilities Act (ADA) upgrades is estimated at $1,026,397.78. <br />Budizet Authority <br />This project will be funded with the following existing CIP accounts: <br />1) $1,211,101.00, Annual Overlay /Rehabilitation 2010 -11, Account No. 149 -38 -327; <br />2) $23,400.00, Water Pollution Control Plant Fund, Account No. 593 -52 -117 for sewer <br />related work; and <br />3) $28,600.00, Neighborhood Traffic Calming Program, Account No. 120 -28 -167 for the <br />speed cushions to be installed on Victoria Court and Victoria Avenue <br />Tracy Vesel , Finance Di f ctor <br />CONCLUSION <br />Staff recommends approval of the plans and specifications and calling for bids for the subject <br />proj ect. <br />GA Items In Process\JUN 201Annual Overlay -Rehab 2010 -11 - P &S1Annual Overlay Rehab 10 -11 MEM.Docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.