BID SUMMARY
<br />This document Is a summary of bids received for the subject project and are provided
<br />only as a convenience. Listing of a particular bid is not a finding that such bid has
<br />been found to be responsive or accepted as complete by the City. An award of
<br />contract, if any, Is subject to approval of the City Council andlor the City Manager.
<br />Contractors should refer to the contract documents for bidding information.
<br />PROJECT TITLE: Street Light Undergrounding- E.14th (150th to So. City Limit)
<br />PROJECT NO.: 07- 210 -38 -172
<br />BID NO.: 09- 10.021
<br />BID OPENING
<br />ENGINEEKS ESTIMATE
<br />Tennyson Electric, Inc.
<br />St. Francis Electric
<br />Columbia Electric, Inc.
<br />DATE: Tuesday, May 17, 2011
<br />Date Approved:
<br />7275 National Drive, Ste. A2
<br />975 Carden Street
<br />1980 Davis Street
<br />TIME: 3:00 PM
<br />Prepared by: KL
<br />Livermore, CA 94550
<br />San Leandro, CA
<br />San Leandro, CA 94577
<br />LOCATION: City Clark
<br />$12,000.00
<br />Phone: 925- 606 -1038
<br />Phone: 510 -639 -0639
<br />Phone: 510- 430 -9505
<br />$2,500.00
<br />$2,500.00
<br />Fax: 925-606 -7655
<br />Fax: 510 -639 -4655
<br />Fax: 510-430-1860
<br />ITEM
<br />3
<br />I
<br />I
<br />NO,
<br />QUANTITY
<br />ITEM
<br />UNIT COST
<br />I ITEM COST
<br />I UNIT COST
<br />I ITEM COST
<br />I UNIT COST
<br />I ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />BASE BID:
<br />1
<br />1 LS
<br />Mobilization
<br />$13,261.40
<br />$13,261.40
<br />$9,000.00
<br />$9,000.00
<br />$5,000.00
<br />$5,000.00
<br />$5,000.00
<br />$5,000.00
<br />2
<br />1 LS
<br />Construction Area Traffic
<br />$3,000.00
<br />$3,000.00
<br />$12,000.00
<br />$12,000.00
<br />$2,600.00
<br />$2,500.00
<br />$2,500.00
<br />$2,500.00
<br />Control Devices
<br />3
<br />1 LS
<br />Water Pollution Control
<br />$1,000.00
<br />$1,000.00
<br />$1,000.00
<br />$1,000.00
<br />$500.00
<br />$500.00
<br />$500.00
<br />$500.00
<br />4
<br />18 EA
<br />Remove Streellight, Pole,
<br />$705.00
<br />$12,690.00
<br />$1,100.00
<br />$19,800.00
<br />$750.00
<br />$13,500.00
<br />$850.00
<br />$15,300.00
<br />Conductors, Pullbox &
<br />Foundation
<br />5
<br />1 LS
<br />Demolish Meter Cabinet,
<br />$2,600.00
<br />$2,600.00
<br />$900.00
<br />$900.00
<br />$500.00
<br />$500.00
<br />$1,100.00
<br />$1,100.00
<br />Equipment, and Foundation
<br />6
<br />23 EA
<br />Type 15 Steel Pole w/ 15' Mast
<br />$3,990.00
<br />$91,770.00
<br />$2,576.00
<br />$59,248.00
<br />$1,500.00
<br />$34,500.00
<br />$2,000.00
<br />$46,000.00
<br />Arm Assembly and
<br />Weatherproof Recepticles
<br />7
<br />21 EA
<br />New Street Light Foundation
<br />$900.00
<br />$18,900.00
<br />$920.00
<br />$19,320.00
<br />$1,250.00
<br />$26,250.00
<br />$1,800.00
<br />$37,800.00
<br />8
<br />1 LS
<br />Disconnect Power to City
<br />$300.00
<br />$300.00
<br />$200.00
<br />$200.00
<br />$500.00
<br />$500.00
<br />$1,500.00
<br />$1,500,00
<br />Streetlight Fixture at Station
<br />14+50
<br />9
<br />1 LS
<br />New Weatherproof Meter
<br />$11,959.00
<br />$11,959.00
<br />$6,500.00
<br />$6,500.00
<br />$4,850.00
<br />$4,850.00
<br />$10,000.00
<br />$10,000.00
<br />Pedestal wt 42- Circuit Panel,
<br />1201240 Volt, 100A with Photo
<br />old Summary.As Page 1 of 9 Printed 5/18/2011 @ 2:34 PM