My WebLink
|
Help
|
About
|
Sign Out
Home
8U Consent 2011 0620
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2011
>
Packet 2011 0620
>
8U Consent 2011 0620
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 9:41:06 AM
Creation date
6/16/2011 4:39:16 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
6/20/2011
Retention
PERM
Document Relationships
_CC Agenda 2011 0620
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 0620
Reso 2011-122
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
Reso 2011-123
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Heron Bay —Engineer's Report FYI 1-12 2 June 20, 2011 <br />as part of the Heron Bay development, including landscaping, storm water facilities, marshlands <br />and trail areas at the westerly end of Lewelling Boulevard. <br />Willdan Financial Services was retained as the engineer of work, and prepared the Annual <br />Engineer's Report for FY 2011-12. A copy of the Engineer's Report is attached to the resolution <br />accepting the Engineer's Report. <br />Analysis <br />Services to the District will be provided by the following: the City of San Leandro Public Works <br />Department; the County of Alameda Public Works Agency; outside consultants; and outside <br />contractors. In addition to maintenance of the facilities, the marshland will be monitored to <br />confirm its health and feral animals will be removed from the area. The total cost of these <br />services for FY 2011-12 is estimated at $261,920. <br />The levee system that protects the marsh needs routine maintenance. Staff has targeted 2014-15 <br />as the year for a maintenance project. The District will contribute $150,000 to a CIP project for <br />levee repair this year. Additional funds may be contributed in subsequent years. <br />The District fund balance is estimated to be $512,000 at the end of FY 2010-11. Exceptionally <br />low bids for landscape maintenance and below average needs for tide gate repairs and <br />maintenance allowed for a positive fund balance. In accordance with the District rules, $300,000 <br />of the funds must be held as a maintenance reserve for capital improvements and unexpected or <br />emergency repairs. <br />Fund Balance - end of FY 2010-11 estimated $512,000.00 <br />Maintenance costs - FY 2011-12 estimated ($261,920.00) <br />Funding for Levee maintenance project - FY 2014-15 ($150,000.00) <br />Assessments - FY 2011-12 $195,198.00 <br />Interest Income - FY 2011-12 estimated $4,722.00 <br />Fund Balance - end of FY 2011-12 estimated $300,000.00 <br />The Annual Engineer's Report includes the following: <br />• Description of improvements maintained by funds provided by the District <br />• Budget based upon estimated costs for FY 2011-12 <br />• Table of maximum annual assessments, method of apportionment, and calculation of <br />proposed assessment <br />• Reference to location of Assessment Diagram for District <br />• Assessment Roll showing each property to be assessed and the amount of assessment <br />
The URL can be used to link to this page
Your browser does not support the video tag.