Laserfiche WebLink
BID SUMMARY <br />ENGINEER'S ESTIMATE <br />Date Approved: <br />Prepared by: KL <br />BID OPENING <br />UNIT COST I <br />DATE: Thursday, June 2, 2011 <br />UNIT COST <br />TIME: 3:00 PM <br />LOCATION: City Clerk <br />$2,400.00 <br />$250.00 <br />$1,000.00 <br />ITEM <br />$3,738.00 <br />$160.00 <br />NO. <br />QUANTITY <br />ITEM <br />42 <br />4 EA <br />Bike Lane Signs & Post <br />43 <br />42 TN <br />Asphalt Concrete Paving at <br />$30.00 <br />$1,500.00 <br />Heron Bay <br />44 <br />63 TN <br />3/4" Max Aggregate Base <br />45 <br />178 LF <br />Redwood Header Board <br />46 <br />50 CY <br />Excavation at Heron Bay <br />47 <br />1 LS <br />Adjust Irrigation System at <br />$11,610.00 <br />Heron Bay <br />48 <br />2,950 SY <br />Fog Sealing at Heron Bay <br />49 <br />387 SF <br />Install Curb Ramp w/ Truncated <br />Domes Per City Std Plan No. <br />106A and 106B (rDA- Funded) <br />50 <br />58 LF <br />Curb & Gutter (TDA- Funded) <br />51 <br />8 EA <br />Install Pedestrian Push Button <br />to be Furnished by City <br />ENGINEER'S ESTIMATE <br />Date Approved: <br />Prepared by: KL <br />Redgwick Construction Co. <br />8150 Enterprise Drive <br />Newark, CA 94560 <br />Phone: 510 - 792 -1727 <br />Fax: 510 -792 -1728 <br />UNIT COST I <br />ITEM COST I <br />UNIT COST <br />ITEM COST <br />$600.00 <br />$2,400.00 <br />$250.00 <br />$1,000.00 <br />$89.00 <br />$3,738.00 <br />$160.00 <br />$6,720.00 <br />$83.00 <br />$5,229.00 <br />$60.00 <br />$3,780.00 <br />$3.00 <br />$534.00 <br />$6.00 <br />$1,068.00 <br />$30.00 <br />$1,500.00 <br />$60.00 <br />$3,000.00 <br />$500.00 <br />$500.00 <br />$100.00 <br />$100.00 <br />$2.50 <br />$7,375.00 <br />$0.90 <br />$2,655.00 <br />$16.50 <br />$5,385.50 <br />$30.00 <br />$11,610.00 <br />Gallagher & Burk, Inc. <br />344 High Street <br />Oakland, CA 94601 <br />�hone:510- 261 -0466 <br />:ax 510 -261 -0478 <br />Top Grade Construction, Inc. <br />50 Contractors Street <br />Livermore, CA 94551 <br />Phone: 925 -449 -5764 <br />Fax: 925-449 -5875 <br />UNIT COST I <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />$200.00 <br />$800.00 <br />$260.00 <br />$1,040.00 <br />$150.00 <br />$6,300.00 <br />$140.00 <br />$5,880.00 <br />$80.00 <br />$5,040.00 <br />$55.00 <br />$3,465.00 <br />$10.00 <br />$1,780.00 <br />$13.00 <br />$2,314.00 <br />$100.00 <br />$5,000.00 <br />$32.00 <br />$1,600.00 <br />$1,000.00 <br />$1,000.00 <br />$700.00 <br />$700.00 <br />$1.00 <br />$2,950.00 <br />$0.50 <br />$1,475.00 <br />$16.00 <br />$6,192.00 <br />$21.00 <br />$8,127.00 <br />TOTAL BASE BID: <br />BID ALTERNATE NO. 1 <br />Al 18 EA Adjust Water Valve Pot Frame <br />& Cover to Grade (Non - <br />Participating) <br />TOTAL BID ALTERNATE NO. 1; <br />$45.00 <br />$150.00 <br />$2,610.00 <br />$1,200.00 <br />$50.001 <br />$200.00 <br />$2,900.00 <br />$1,600.00 <br />$40.001 <br />$250.00 <br />$2,320.00 <br />$2,000.00 <br />$29.001 <br />$300.00 <br />$1,682.00 <br />$2,400.00 <br />$1,081,077.90 <br />$1,254,749.95 <br />$1,270,866.00 <br />$1,327,460.00 <br />$800.001 <br />$14,400.001 <br />$220.001 <br />$3,960.00 <br />1 $500.001 <br />$9,000.00 <br />1 $460.001 <br />$8,280.00 <br />$3,960.00 1 $9,000.00 1 $8,280.00 <br />TOTAL BASE BID: $1,081,077.90 $1,254,749.95 $1,270,866.00 $1,327,460.00 <br />TOTAL BID ALTERNATE NO. 1: <br />$14,400.00 $3,960.00 $9,000.00 $8,280.00 <br />TOTAL BID: $1,095,477.90 $1,258,709.95 *' $1,279,WS.00 $1,335,740.00 <br />Bid Summary-Marina Blvd Street Rehabilitabon.)ds Page 4 of 10 Printed $02011 Q 2:27 PM <br />