BID SUMMARY
<br />BID OPENING
<br />ENGINEER'S ESTIMATE
<br />Monterey Mechanical Co.
<br />Proven Management, Inc.
<br />F &H Construction
<br />DATE: Wedneday, April 12, 2011
<br />Date Approved: 3/1612011
<br />8275 San Leandro Street
<br />712 Sansome Street
<br />4945 E. Waterloo Road
<br />TIME: 3:00 PM
<br />Prepared by: KC
<br />Oakland, CA 94621
<br />San Francisco, CA 94111 -1704
<br />Stockton, CA 95215
<br />LOCATION: City Clerk
<br />Phone: 510- 632 -3173
<br />Phone: 415 -421 -9500
<br />Phone: 209 -931 -3738
<br />Fax: 510. 632.0732
<br />Fax: 415-421-9600
<br />Fax: 209-931-4427
<br />ITEM
<br />NO.
<br />QUANTITY
<br />ITEM
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />TOTAL BASE BID: $44,497,000.00
<br />$39,434,000.00
<br />$42,461,686.00
<br />$42,879,000.00
<br />TOTAL BID ALTERNATE NO. 1:
<br />$4,056,000.00
<br />$6,778,000.00
<br />$4,869,716.00
<br />$4,770,000.00
<br />TOTAL BID: $48,883,000.00
<br />$46,209,000.00
<br />$47,331,401.00
<br />$47,349,000.00
<br />SUBCONTRACTORS:
<br />Ferma Corp, Strom & Graff.
<br />Malcolm Drilling, ECAApplicatlons,
<br />Ferma Corp. Stroer & Grag,
<br />Malcolm Drilling, International
<br />Suarez & Munoz, Alamlllo, Cell.
<br />International Lining Tech, Conco
<br />Lining Tech, R &W Concrete, Harris
<br />Crete, Creative Masonry, Cook
<br />Reinforcing, Rain for Rent, Dowdle
<br />Salinas, Tucker Eng., HGH; Inc.,
<br />Coatings, JBIANestch, DLI
<br />& Sons, Blocks Construction,
<br />McNely Construction, Redwood
<br />Mechanical, James Long, COSCO,
<br />Tucker Engineering, Steiny Electric
<br />Paining
<br />3D Electric
<br />Co., Malcolm Drilling, MV
<br />Plumbing, Hansen Painting, Blocka
<br />Construction, FD Thomas, Kevin
<br />Sullivan, G2 Metal Fab,
<br />SECURITIES:
<br />10% Bid Bond
<br />10% Bid Bond
<br />10% Bid Bond
<br />NOTES:
<br />Reviewed by:
<br />Reviewed by.
<br />Project Manager
<br />Osakwe, Senior Engineer
<br />Date:
<br />Date: j
<br />Bid Summary with Alternates -WPCP Rehab ProjectAs Page 4 of 6 Printed 4/15/2011 Ck 9:154 AM