Laserfiche WebLink
BID SUMMARY <br />BID OPENING <br />ENGINEER'S ESTIMATE <br />Monterey Mechanical Co. <br />Proven Management, Inc. <br />F &H Construction <br />DATE: Wedneday, April 12, 2011 <br />Date Approved: 3/1612011 <br />8275 San Leandro Street <br />712 Sansome Street <br />4945 E. Waterloo Road <br />TIME: 3:00 PM <br />Prepared by: KC <br />Oakland, CA 94621 <br />San Francisco, CA 94111 -1704 <br />Stockton, CA 95215 <br />LOCATION: City Clerk <br />Phone: 510- 632 -3173 <br />Phone: 415 -421 -9500 <br />Phone: 209 -931 -3738 <br />Fax: 510. 632.0732 <br />Fax: 415-421-9600 <br />Fax: 209-931-4427 <br />ITEM <br />NO. <br />QUANTITY <br />ITEM <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />TOTAL BASE BID: $44,497,000.00 <br />$39,434,000.00 <br />$42,461,686.00 <br />$42,879,000.00 <br />TOTAL BID ALTERNATE NO. 1: <br />$4,056,000.00 <br />$6,778,000.00 <br />$4,869,716.00 <br />$4,770,000.00 <br />TOTAL BID: $48,883,000.00 <br />$46,209,000.00 <br />$47,331,401.00 <br />$47,349,000.00 <br />SUBCONTRACTORS: <br />Ferma Corp, Strom & Graff. <br />Malcolm Drilling, ECAApplicatlons, <br />Ferma Corp. Stroer & Grag, <br />Malcolm Drilling, International <br />Suarez & Munoz, Alamlllo, Cell. <br />International Lining Tech, Conco <br />Lining Tech, R &W Concrete, Harris <br />Crete, Creative Masonry, Cook <br />Reinforcing, Rain for Rent, Dowdle <br />Salinas, Tucker Eng., HGH; Inc., <br />Coatings, JBIANestch, DLI <br />& Sons, Blocks Construction, <br />McNely Construction, Redwood <br />Mechanical, James Long, COSCO, <br />Tucker Engineering, Steiny Electric <br />Paining <br />3D Electric <br />Co., Malcolm Drilling, MV <br />Plumbing, Hansen Painting, Blocka <br />Construction, FD Thomas, Kevin <br />Sullivan, G2 Metal Fab, <br />SECURITIES: <br />10% Bid Bond <br />10% Bid Bond <br />10% Bid Bond <br />NOTES: <br />Reviewed by: <br />Reviewed by. <br />Project Manager <br />Osakwe, Senior Engineer <br />Date: <br />Date: j <br />Bid Summary with Alternates -WPCP Rehab ProjectAs Page 4 of 6 Printed 4/15/2011 Ck 9:154 AM <br />