Laserfiche WebLink
EXHIBIT A <br />SCOPE OF SERVICES <br />1. UNDERSTANDING. The City of San Leandro (City) owns and operates a 7.6 -mgd rated <br />average dry weather flow (ADWF) Water Pollution Control Plant (WPCP) located in San <br />Leandro, California. Carollo Engineers (Consultant) has completed design of the WPCP <br />Rehabilitation Project to restore the capacity and function of the WPCP with improvements to <br />various existing facilities and by adding new facilities. Construction of the project will be <br />performed by S.J. Amoroso Construction Co., Inc. Construction Management of the project will <br />be provided by the City. This contract is to provide Special Inspection as required for the <br />construction of the aforementioned improvements. Inspections are to be performed as required <br />by the plans and specifications, by code compliance, and by the project manager. This Scope of <br />Services is based on a construction period of 690 working days (approximately 32 months) from <br />Contractor's notice to proceed. <br />SCOPE OF WORK— INSPECTIONS <br />Onsite Testing and Inspections: <br />a. Reinforced Concrete — Footings, grade beams, walls, columns, slab on grade, other <br />b. Structural Masonry <br />c. Epoxy Bolts /Proof Load <br />d. Field Welding <br />e. NACE coating inspections <br />Offsite Testing and Inspections: <br />a. Steel shop <br />Laboratory Testing and Engineering: <br />a. Concrete Compression tests <br />b. Grout compression tests <br />c. Mortar compression tests <br />d. Masonary unit — lab testing per spec <br />e. Non shrink grout <br />f. Sample pick -ups <br />a. WPS review <br />Mix designs <br />Final Letter per Exhibit "E" <br />Optional services: <br />a. Compaction Asphalt Concrete <br />b. Earthwork/compaction <br />c. Concrete /soil compression tests <br />Consulting Services Agreement between July 2011 <br />City of San Leandro and CTS, Inc. -- Exhibit A Page 1 of 2 <br />