My WebLink
|
Help
|
About
|
Sign Out
Home
8H Consent 2011 0705
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2011
>
Packet 2011 0705
>
8H Consent 2011 0705
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2011 9:32:05 AM
Creation date
6/30/2011 3:21:44 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/5/2011
Retention
PERM
Document Relationships
_CC Agenda 2011 0705
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 0705
Reso 2011-132
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
Reso 2011-133
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
Reso 2011-134
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
Reso 2011-135
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
Reso 2011-136
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSTRUCTION <br />TESTING SERVICES <br />BASIS OF CHARGES <br />GENERAL <br />TESnNG <br />WSPECTING <br />ENGINEaeNG <br />Fees for tests and inspection include cost of technician, normal equipment and regular reports. Engineering services other than <br />supervisory will be charged at applicable rates. Soils testing with nuclear gauge and/or sand cone equipment may require applicable <br />travel and mileage charges for equipment transport and storage per code. Fees for special projects, services overseas, or elsewhere in <br />the United States, wig be quoted on request. Any yearly increase in hourly fees shall be tied to the Oakland /San Francisco /Oakland /San <br />Jose cost of living index for the 12 months ending in October, not to exceed 1.5 %. The CPI index to use is at the following link: <br />http:ttwww.abog.ca.gov/planningiresearch/epi.html <br />MINIMUM HOURLY CHARGES —INSPECTION <br />Technician personnel and the following minimum charges are contractual commitment: <br />One -half day or less 4 Hours <br />Over one -half day 8 Hours <br />Show -up time (less than 2 hours notice = 4 hour charge) 2 Hours <br />WORKING HOURS AND PREMIUM TIME <br />Regularworkday is the first 8 hours between 6:00 am and 6:00 pm Monday through Friday. Premium time is as follows: <br />Overtime, Weekdays and Saturdays (first 8 hours) 1.5 x quoted hourly rate <br />Overtime Saturdays (over 8 hours) and Sundays (first 8 hours) 2 x quoted hourly rate <br />Overtime Sundays (over 8 hours) and Holidays 3 x quoted hourly rate <br />Shift differential, swing and graveyard - <br />(Work performed between 2:00 pm and 4:00 am) 12.5 additional to base or quoted rate. <br />MISCELLANEOUS CHARGES - Orly Where Applicable <br />Facsimile charges. Plus 1.OD /page (n /c for cover page) <br />$5.00 minimum <br />Parking Fees <br />At Cost <br />Air Travel <br />Cost Plus 5% <br />Outside Services <br />Cost Plus 20% <br />Subsistence (per union contract) <br />$85.00 1day <br />Mileage outside of Northern California (50 mile radius of Pleasanton) Standard Federal Rate <br />Project Management & Administration <br />5% of Monthly Invoice <br />Samples Made by Others: Concrete Cylinders <br />$100 + Test <br />Samples Made by Others: All Other Tests <br />$40 +Test <br />Returned Check Fee <br />$100 <br />TESTS <br />Testing fees shown include normal time for performing test. Samples requiring special preparation will be charged at the laboratory <br />technician rate. Fees for tests not listed will be quoted upon request. There will be a minimum charge of $100.00 for any engineering <br />report. Please note some tests maybe tested by subconsultants. <br />CONCRETE AND MASONRY TESTS <br />PORTLAND CEMENT CONCRETE <br />Compression test. 6" x 12" cylinder (including mold) <br />ASTM C -39 <br />Cylinder molds. 6"x 12" <br />ASTM C -470 <br />Cylinders stored and cured. not tested (including mold) <br />Compression test. Gunite (including sample prep) <br />Compression test. Cores <br />ASTM C -42 <br />Lightweight insulating concrete. 3" x 6" cylinders <br />ASTM C -495 <br />Compression test, including mold <br />Unit Weight test, including m old <br />Flexural test, 6" x 6' x 18" <br />ASTM C -78 <br />Splitting tensile test, 6' x 12" cylinder <br />ASTM C -495 <br />Unit Weight, concrete cylinder <br />Modulus of elasticity (static) <br />ASTM C -469 <br />Laboratory trial batch (mixing and molding only) <br />ASTM C -192 <br />Drying shrinkage (3 specimens — 28 days, including prep) <br />ASTM C -157 Mod <br />Unit Weight— fireproofing, each <br />ASTM E -605 <br />Sample pickup <br />High Strength Concrete —Mix Designsltrial batches/and other considerations <br />Compression tests (over 8000 p.s.1. or 400 k) each <br />Grab sample, sealing and storing for 2 months in a humidity and <br />temperature controlled roam. <br />AgJtes a.bjecf b Basis of C.h- <br />Standard Discounted <br />Rate/Each Rate/Hour <br />$10.00 <br />$40.00 <br />$40.00 <br />$55.00 <br />$60.00 <br />$60.00 <br />$60.00 <br />$200.00 <br />$150.00 <br />$50.00 <br />$210.00 <br />$460.00 <br />$370.00 <br />$100.00 <br />NO CHARGE <br />QOR <br />$100.00 <br />$35.00 <br />Consulting Services Agreement between July 2011 <br />City of San Leandro and CTS, Inc.- Exhibit D Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.