Laserfiche WebLink
• • _ . <br /> ITEM 4 <br /> 8.2 Airport Drive Access Reconfiguration: Design is complete on this project and ' <br /> construction is expected to begin early in 2005. <br /> B.3 Parking Garage: This project is undergoing value engineering and will begin <br /> construction early in 2005. <br /> • <br /> 8.4 Parking Lots: Most of these lots have been constructed and are operational. <br /> B.5 Replacement Rental Car Service Facilities: This project is complete. <br /> 3. Airline and Airport Support <br /> • <br /> .C.1 Provisioning and Catering Buildings: The provisioning building has been <br /> constructed. The catering building is being reevaluated with regard to its need. <br /> C.2 Ground Equipment Service Center. This project has not yet begun. The start <br /> date is undetermined at this time. <br /> C.4 Maintenance Base Expansion: This project has not yet begun. The start <br /> date is undetermined at this time. <br /> 4. Air Cargo <br /> D.1 FedEx Metroplex: The subject property has been leased to FedEx and <br /> portions of this project have been completed while other portions are in design. <br /> • • <br /> D.3'Mufti- tenant Air cargo Facility (now FedEx): Most of the subject property has <br /> been leased to FedEx and portions of this project have been completed while <br /> other portions are in design. <br /> • D.5 Replacement T- hangars: This project is related to the Infield Roadway <br /> (originally a portion of the otherwise deleted Project D.4, North Airport Cargo <br /> Facility) and thus is delayed pending additional funding to complete the <br /> Roadway. <br /> D.6 Belly Cargo Replacement Facility: This project is being planned and will rely <br /> on the Master Plan to ensure a compatible location. <br /> • <br /> 5. Airside Improvements • <br /> • <br /> E.1 Remote Aircraft Parking (multiple areas): Some areas have been <br /> • <br /> constructed, others are in various phases of planning or design. <br />