BID SUMMARY
<br />BID OPENING
<br />ENGINEER'S ESTIMATE
<br />Redgwick Construction Co.
<br />Gallagher & Burk, Inc.
<br />Top Grade Construction, Inc.
<br />DATE: Thursday, June 2, 2011
<br />Date Approved:
<br />8150 Enterprise Drive
<br />344 High Street
<br />50 Contractors Street
<br />TIME: 3:00 PM
<br />Prepared by: KL
<br />Newark, CA 94560
<br />Oakland, CA 94601
<br />Livermore, CA 94551
<br />LOCATION: City Clerk
<br />Phone: 510- 792 -1727
<br />Phone: 510 -261 -0466
<br />Phone: 925 -449 -5764
<br />Fax: 510 -792 -1728
<br />Fax: 510- 261 -0478
<br />Fax: 925- 449 -5875
<br />ITEM
<br />NO.
<br />QUANTITY
<br />ITEM
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />42
<br />4 EA
<br />Bike Lane Signs & Past
<br />$600.00
<br />$2,400.00
<br />$250.00
<br />$1,000.00
<br />$200.00
<br />$600.00
<br />$260.00
<br />$1,040.00
<br />43
<br />42 TN
<br />Asphalt Concrete Paving at
<br />$89.00
<br />$3,738.00
<br />$160.00
<br />$6,720.00
<br />$150.00
<br />$6,300.00
<br />$140.00
<br />$5,880.00
<br />Heron Bay
<br />44
<br />63 TN
<br />314" Max Aggregate Base
<br />$83.00
<br />$5,229.00
<br />$60.00
<br />$3,780.00
<br />$80.00
<br />$5,040.00
<br />$55.00
<br />$3,465.00
<br />45
<br />178 LF
<br />Redwood Header Board
<br />$3.00
<br />$534.00
<br />$6.00
<br />$1,068.00
<br />$10.00
<br />$1,780.00
<br />$13.00
<br />$2,314.00
<br />46
<br />50 CY
<br />Excavation at Heron Bay
<br />$30.00
<br />$1,500.00
<br />$60.00
<br />$3,000.00
<br />$100.00
<br />$5,000.00
<br />$32.00
<br />$1,600.00
<br />47
<br />1 LS
<br />Adjust Irrigation System at
<br />$500.00
<br />$500.00
<br />$100.00
<br />$100.00
<br />$1,000.00
<br />$1,000.00
<br />$700.00
<br />$700.00
<br />Heron Bay
<br />48
<br />2,950 SY
<br />Fog Sealing at Heron Bay
<br />$2.50
<br />$7,375.00
<br />$0.90
<br />$2,655.00
<br />$1.00
<br />$2,950.00
<br />$0.50
<br />$1,475.00
<br />49
<br />387 SF
<br />Install Curb Ramp wI Truncated
<br />$18.50
<br />$6,385.50
<br />$30.00
<br />$11,610.00
<br />$16.00
<br />$6,192.00
<br />$21.00
<br />$8,127.00
<br />Domes Per City Std Plan No.
<br />106A and 106B (TDA- Funded)
<br />50
<br />58 LF
<br />Curb & Gutter (TDA - Funded)
<br />$45,00
<br />$2,610.00
<br />$50.00
<br />$2,900.00
<br />$40.00
<br />$2,320.00
<br />$29.00
<br />$1,682.00
<br />51
<br />8 EA
<br />Install Pedestrian Push Button
<br />$150.00
<br />$1,200.00
<br />$200.00
<br />$1,600.00
<br />$250.00
<br />$2,000.00
<br />$300.00
<br />$2,400.00
<br />to be Furnished by City
<br />TOTAL BASE 13ID: $1,081,077.90
<br />$1,254,749.95
<br />$1,270,866.00
<br />$1,327,460.00
<br />BID ALTERNATE NO. 1
<br />Al
<br />18 EA
<br />Adjust Water Valve Pot Frame
<br />$800.00
<br />$14,400.00
<br />$220.00
<br />$3,960.00
<br />$500.00
<br />$9,000.00
<br />$460.00
<br />$8,280,00
<br />& Cover to Grade (Non -
<br />Participating)
<br />TOTAL BID ALTERNATE NO. 1: $14,400.00
<br />$3,960.00
<br />$9,000.00
<br />$8,280.00
<br />TOTAL BASE BID: $1,081,077.90 $1,254,749.95 $1,270,866.00 $1,327,460.00
<br />TOTAL BID ALTERNATE NO. 1:
<br />$14,400.00 $3,960.00 $9,000.00 $8,280.00
<br />TOTAL BID: $1,095,477.90 $1,256,709.95 $1,279,866.00 $1,335,740.00
<br />Bid Summary- Marina Blvd Street Rehabilitation.xls Page 4 of 10 Printed 7/6/2011 @ 11:48 AM
<br />
|