My WebLink
|
Help
|
About
|
Sign Out
Home
8O Consent 2011 0718
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2011
>
Packet 2011 0718
>
8O Consent 2011 0718
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2011 10:20:46 AM
Creation date
7/14/2011 3:42:18 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/18/2011
Retention
PERM
Document Relationships
_CC Agenda 2011 0718
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 0718
Reso 2011-150
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Principal <br />Golden Associates, Landscape Architects, a professional corporation <br />4400 Market Street <br />Oakland, CA 94618 <br />email: Igolden(c)golden land arch. com / phone: 510 - 465 -4030 / fax: 510 - 465 -5325 <br />Any written notice to City shall be sent to: <br />Mark Goralka <br />Associate Engineer <br />City of San Leandro <br />835 East 14th Street <br />San Leandro, Ca 94577 <br />email: mgoralka a4sanleandro.org / phone: 510 - 577 -3329 / fax: 510 - 355 -3294 <br />10.11 Professional Seal. Where applicable in the determination of the contract administrator, <br />the first page of a technical report, first page of design specifications, and each page of <br />construction drawings shall be stamped /sealed and signed by the licensed professional <br />responsible for the report/design preparation. The stamp /seal shall be in a block entitled <br />"Seal and Signature of Registered Professional with report/design responsibility," as in the <br />following example. <br />Seal and Signature of Registered Professional with <br />report/design responsibility. <br />10.12 Integration. This Agreement, including the scope of work attached hereto and <br />incorporated herein as Exhibits A, B, C represents the entire and integrated agreement <br />between City and Consultant and supersedes all prior negotiations, representations, or <br />agreements, either written or oral. <br />Exhibit A <br />Scope of Services <br />Exhibit B <br />Payment Schedule <br />Exhibit C <br />Public Works Requirements <br />10.13 Counterparts. This Agreement may be executed in multiple counterparts, each of which <br />shall be an original and all of which together shall constitute one agreement. <br />Consulting Services Agreement between BART- Downtown Pedestrian Interface <br />City of San Leandro and Golden Associates Page 13 of 14 <br />989837 -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.