My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2011 Carollo Engineers Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2011
>
Agmt 2011 Carollo Engineers Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2011 12:32:59 PM
Creation date
7/21/2011 12:32:57 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
7/5/2011
Retention
PERM
Document Relationships
Reso 2011-133
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
facilities, digesters, administration control building, and remaining portion of the project. For this <br /> task, a budget equivalent to about 140 hours have been included but can be higher or lower <br /> depending on the actual effort required. <br /> Information Provided by City: <br /> • None. <br /> Consultant Deliverables: <br /> • Field memos on punch -list items for various facilities. <br /> Task 4.7 — Geotechnical Engineering Support Services. Consultant's geotechnical engineer <br /> (Fugro) shall provide the following services: field services, laboratory services, and office <br /> services for construction of the WPCP Rehabilitation Project for applicable new structures listed <br /> on structural sheets 172 through 229 and structural sheets 459 to 481. <br /> • General services: Fugro will monitor project progress and field observation and testing <br /> services, provide onsite geotechnical consultants, review project plans, and attend project <br /> meetings on an as- requested basis. As part of each site visit, a computer - generated Daily <br /> Field Report (DFR) will be prepared to document the day's geotechnical- related <br /> construction activities, together with the results of field density tests taken that visit. Final <br /> reviewed copies will be submitted to the City at the City's request. <br /> • Site preparation and mass grading: For building pad preparation, Fugro will provide part- <br /> time observation during excavation of undocumented fills, and full -time observation and <br /> nuclear gauge density testing during fill placement and compaction. <br /> • Fixed Film Reactor Construction: During construction of the FFR, Fugro will be on -site <br /> full -time to observe the installation of soil cement columns, and their engineering <br /> technician will provide full -time observation and testing during fill placement and <br /> compaction, and /or observation and sampling of lightweight concrete placement, if <br /> needed. <br /> • Trench and retaining wall backfill: For underground utility line trench and retaining wall <br /> backfill operations within a 1:1 prism extending out from the bottom of slab foundations, <br /> Fugro will provide part-time to full -time observation and nuclear gauge. density testing <br /> services during fill placement and compaction, including lightweight fill for deep <br /> trenches extending into bay margin soils. The effort included in the scope is based on <br /> Consulting Services Agreement between Project No. 08- 593 -52 -239 <br /> City of San Leandro and Carollo Engineers, Inc. Page 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.