Laserfiche WebLink
Consultant Deliverables: <br /> • One hard copy of the half -sized and full -size record drawings. <br /> • One electronic copy (pdf) of the record drawings. <br /> • Auto CAD drawing files with .ctb files, plot configuration files, and Xref drawings. <br /> Task 8 - Operation and Maintenance Manual Updates <br /> Consultant shall prepare operation and maintenance manual updates for new elements of this <br /> project to the plant's exiting manual. <br /> Task 8.1 - Operation and Maintenance Manuals Updates. Consultant shall prepare new <br /> chapters to the plant's existing operation and maintenance (O &M) manual in paper format for <br /> the WPCP Rehabilitation Project that include following new facilities. <br /> • Influent Pump Station <br /> • Headworks Bar Screens <br /> • Grit Facility <br /> • Preliminary Treatment Biofilter <br /> • Primary Clarifier No. 3 <br /> • Fixed Film Reactor <br /> • Fixed Film Reactor Biofilter <br /> • Fixed Film Reactor Lift Station <br /> • Equalization Pump Station <br /> • Secondary Clarifier No. 2 <br /> • Equalization Basin <br /> • Equalization Pond <br /> • Equalization Return Pump Station <br /> • Electrical System <br /> Consulting Services Agreement between Project No. 08- 593 -52 -239 <br /> City of San Leandro and Carollo Engineers, Inc. Page 26 <br />