Laserfiche WebLink
For this task, a budget equivalent to about 1,100 hours have been included for the Consultant but <br /> can be higher or lower depending on the actual effort required. <br /> Information Provided by City: <br /> • Potential claim issues. <br /> • Proposed changes to contract documents. <br /> • Proposed change orders. <br /> • Potential field issues. <br /> • Consultant Deliverables: <br /> • Assistance with claim issues. <br /> • <br /> • Completed specifications, drawings, and/or sketches per proposed changes to contract <br /> documents. <br /> • Written review comments to change orders. <br /> • Redesign services (corrective sketches and specifications). <br /> Consulting Services Agreement between Project No. 08- 593 -52 -239 <br /> City of San Leandro and Carollo Engineers, Inc. Page 28 <br />