EXHIBIT A <br /> SCOPE OF SERVICES <br /> I. UNDERSTANDING. The City of San Leandro (City) owns and operates a 7.6 -mgd rated <br /> average dry weather flow (ADWF) Water Pollution Control Plant (WPCP) located in San <br /> Leandro, California. Carollo Engineers (Consultant) has completed design of the WPCP <br /> Rehabilitation Project to restore the capacity and function of the WPCP with improvements to <br /> various existing facilities and by adding new facilities. Construction of the project will be <br /> performed by S.J. Amoroso Construction Co.. Inc. Construction Management of the project will <br /> be provided by the City. This contract is to provide Special Inspection as required for the <br /> construction of the aforementioned improvements. Inspections are to be performed as required <br /> by the plans and specifications, by code compliance, and by the project manager. This Scope of <br /> Services is based on a construction period of 690 working days (approximately 32 months) from <br /> Contractor's notice to proceed. <br /> 2. SCOPE OF WORK — INSPECTIONS. <br /> Onsite Testing and Inspections: <br /> a. Reinforced Concrete — Footings, grade beams, walls, columns, slab on grade, other <br /> b. Structural Masonry <br /> c. Epoxy Bolts /Proof Load <br /> d. Field Welding <br /> e. NACE coating inspections <br /> Offsite Testing and Inspections: <br /> a. Steel shop <br /> Laboratory Testing and Engineering: <br /> a. Concrete Compression tests <br /> b. Grout compression tests <br /> c. Mortar compression tests <br /> d. Masonary unit — lab testing per spec <br /> e. Non shrink grout <br /> f. Sample pick -ups <br /> g. WPS review <br /> h. Mix designs <br /> i. Final Letter per Exhibit °E° <br /> Optional services: <br /> a. Compaction Asphalt Concrete <br /> b. Earthwork/compaction <br /> c. Concrete /soil compression tests <br /> Consulting Services Agreement between July 2011 <br /> City of San Leandro and CTS, Inc. — Exhibit APage 1 of 2 <br />