Laserfiche WebLink
Table A -1 <br />Fund 593 Wastewater System Assets <br />002286 P <br />PROCESS PIPING 0 <br />01/01/1988 <br />002287 P <br />PUMP WIMOTOR 0 <br />01/01/1990 <br />002288 P <br />PUMP W /MOTOR 0 <br />01/01/1990 <br />002289 P <br />PUMP W /MOTOR 0 <br />01/01/1990 <br />002290 P <br />PROCESS PIPING 0 <br />01/01/1990 <br />002291 P <br />PUMP W /MOTOR 0 <br />01/0111993 <br />002292 P <br />PUMP W /MOTOR 0 <br />01/0111993 <br />002293 P <br />PUMP W /MOTOR 0 <br />0110111993 <br />Total Wastewater System <br />Notes: <br />a. Asset data was provided by the City. The data excludes the following four assets for collection system pipe <br />Collection system pipe values are based on replacement costs as shown in the body of the table <br />002220 GROUP OF UNDERGROUND PIPING 01/0111948 $136,780 <br />002221 GROUP OF UNDERGROUND PIPING 01/0111968 $517,091 <br />002222 GROUP OF UNDERGROUND PIPING 01/0111991 $296,116 <br />002693 STORM DRAIN - WICKS PUMP ST -LAND #194 06/2712003 $479,506 <br />002764 ESTUDILLO SANITARY SEWER EXTENSION 06/2912004 $292.27 7 <br />$1,721,769 <br />b. The EBDA Facilities data are from Table 26 (on page 81) of the May 1997 Wastewater User Change and Connection Fee Study. <br />Chapter 6 of the study describing the development of Connection Fees (pp. 79 -87) is included in Appendix B <br />c. Escalated costs are the acquisition costs escalated using the Construction Cost Index <br />values for 20- cities published by the Engineering News Record. ENR Construction Cost Index data is listed in Appendix C. <br />Valuation Year = 2008 <br />ENR CCI Escalation Total <br />Index (c) Factor (c), Escalated <br />Acquisition Year in Year Current Acquisition <br />Cost Acquired Acquired = 8310 Cost <br />$53,751 1993 5214 113960 $85,733 <br />$71,398 1988 4519 1,8389 $131,295 <br />$12,337 1990 4732 1.7561 $21,666 <br />$12,337 199D 4732 1.7561 $21,666 <br />$12,337 1990 4732' ` 1.7581 $21,666 <br />$9,047 1990 4732' 1.7,84 $15,888 <br />$13,217 1993 $210; 1.5950 $21,082 <br />$13,217 1993 6210' 1.5950 $21,082 <br />$13,217 1993 5210 1.5050 $21,082 <br />$31,369 1903 3210 1.5950 $50,034 <br />$7,747 2001 6342' 1.3103 $10,151 <br />$7,747 2001 (;* 1.3103 $1 ©,151 <br />$7,747 2001 6342' 1.3103 $10,151 <br />$6,259 2002 6538 1.2710 57,956 <br />$17,623 1999 6060 1,3713 $24,166 <br />$4,163 2001 6342 1.3103 $5,455 <br />$6,392 2001 6342 1.3103 $8,378' <br />$3,681 2000 6221` 1.3356 $4,916': <br />$7,145 2000 6221' 1,3358 $9,545 <br />$3,678 2002 6638 1.2710 $4,674 <br />$3,743 2002 6538 1.2710 $4,757 <br />$3,333 2002 6538 1.2710 $4,236 <br />$3,333 2002 6538" 1.2710 $4;236 <br />$5,325 2002 6538 1.2710 $6,768 <br />$5,217 2002 6536 1.2710 $6,631 <br />$2,754 1999 6060" 1,3713 $3,777 <br />$10,625 2002 6538 i 1.2710 r $13,505 <br />$9,807 2002 6538 ` 1,2710: $12,465 <br />$12,232 2003 6694' 1;2444 $15,485. <br />$6,387 2003 6694 1.2444 $7,929 <br />$4,385 2003 6694`'r 1,2414 $6,443' <br />$8,972 2003 6694 1.2414 $11,436 <br />$49,213 2003 6694 [ 1,2414 461,093 <br />$46,764 2003 6694 1,2414 $58,053 <br />$24,681 2003 6694` 1.2414 $30,639 <br />$26,840 2005 7446 1.1160 $29,953' <br />$26,840 2006 7446', 1.1160 $29,953 <br />$8,817 2005 7446`- 1.1160 $9,840 <br />$37,715 2006 7751 1.0721 $40,433 <br />$8,189 2006 7751. 1.0721 $6,779 <br />$26,840 2005 7446 1.1160 $29;963 <br />$18,372 2006 7751 1.0721 $19;697 <br />$7,066 2006 7751 1.0721 $7,575 <br />$6,275 2007 7967 1.0431 $6,545° <br />$63,597 '2004 7115 1.1679 $74;277 <br />$8,078,850 $38,024,156 <br />$7,623,000 1998 5920'- 1.4037 $10,700,512 <br />$8,655,000 1998 5920 1.4037 $12,149,144 <br />$16,278,000 $22,849,656 <br />miles Linear Feet /ELF Replacement Cos <br />130 686,400 $240 $164,736,000 <br />$225,609,812 <br />Page 4 of 4 Appendix A <br />$225,609,812 <br />Page 4 of 4 Appendix A <br />