E3
<br />PROJECT TITLE
<br />PROJECT NO.
<br />BID NO.
<br />Annual Sidewalk Program 2011 -12
<br />2009.0241
<br />11- 12.003
<br />BID SUMMARY
<br />This document is a summary of bids received for the subject project and are
<br />provided only as a convenience. Listing of a particular bid Is not a finding that such
<br />bid has been found to be responsive or accepted as complete by the City. An award
<br />of contract, if any, is subject to approval of the City Council and /or the City Manager.
<br />Contractors should refer to the contract documents for bidding information.
<br />BID OPENING
<br />ENGINEER'S ESTIMATE
<br />JJR Construction, Inc.
<br />Spencon Contruction, Inc.
<br />Roses Brothers Construction
<br />DATE: Wednesday, August 17, 2011
<br />Date Approved: 7/7/2011
<br />1120.Ninth Avenue
<br />P. O. Box 1220
<br />4731 Coliseum Way
<br />TIME: 3:00 PM
<br />Prepared by: NT
<br />San Mateo, CA 94402
<br />Danville, CA 94526
<br />Oakland, CA 94601
<br />LOCATION: City Clerk
<br />Phone: 650 - 343 -6109
<br />Phone: 925 -984 -2561
<br />Phone: 510- 534 -1077
<br />Fax: 650 -343 -6207
<br />Fax: 925 -984 -2583
<br />Fax: 510 -534 -5077
<br />ITEM
<br />NO.
<br />QUANTITY
<br />ITEM
<br />UNIT COST
<br />ITEM COST
<br />UNIT C OST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />19
<br />2 Plans
<br />Provide traffic control plan and
<br />$1,750.00
<br />$3,500.00
<br />$800.00
<br />$1,600.00
<br />$300.00
<br />$600.00
<br />$300.00
<br />$600.00
<br />Implement traffic control per
<br />section 7- 10.3.3 and 7- 10.3.4
<br />without a flashing arrow panel
<br />20
<br />4 EA
<br />Remove existing pavers, trim
<br />$650.00
<br />$2,600.00
<br />$250.00
<br />$1,000,00
<br />$240.00
<br />$960.00
<br />$300.00
<br />$1,200.00
<br />roots, and install decomposed
<br />granite at existing tree well
<br />21
<br />4 EA
<br />Install decompsed granite at
<br />$400.00
<br />$1,600.00
<br />$150.00
<br />$600.00
<br />$150.00
<br />$600.00
<br />$200.00
<br />$800.00
<br />empty tree well
<br />22
<br />30 EA
<br />Remove and replace 2'x 2' of
<br />$300.00
<br />$9,000.00
<br />$100.00
<br />$3,000.00
<br />$85.00
<br />$2,550.00
<br />$90.00
<br />$2,700.00
<br />temporary AC patch to allow
<br />compaction testing by others
<br />23
<br />375 SF
<br />Compact existing base at
<br />$11.50
<br />$4,312.50
<br />$4.00
<br />$1,500.00
<br />$4.00
<br />$1,500.00
<br />$5.00
<br />$1,875.00
<br />roadway excavation per section
<br />301 -2.
<br />24
<br />500 SF
<br />Excavation resurfacing per
<br />$12.50
<br />$6,250,00
<br />$9.00
<br />$4,500.00
<br />$9.00
<br />$4,500.00
<br />$9.00
<br />$4,500.00
<br />drawing 122A, B, C cast 3101:
<br />6" thickness
<br />25
<br />125 SF
<br />Excavation resurfacing per
<br />$15.00
<br />$1,875.00
<br />$11.00
<br />$1,375.00
<br />$10.00
<br />$1,250.00
<br />$12.00
<br />$1,500.00
<br />drawing 122A, S, C cast 3101:
<br />9" thickness
<br />26
<br />125 SF
<br />Excavation resurfacing per
<br />$17.00
<br />$2,125.00
<br />$13.00
<br />$1,625.00
<br />$12.00
<br />$1,500.00
<br />$14.00
<br />$1,750.00
<br />drawing 122A, B, C cast 3101:
<br />12" thickness
<br />TOTAL BASE BID: $362,682.60
<br />$271,140.00 "`
<br />$283,260.00
<br />$285,675.00
<br />SUBCONTRACTORS:
<br />None Listed
<br />Breakaway
<br />None List
<br />Bid Summary.xlsx Page 3 of 8 Printed 8/17/2011 ® 4:56 PM
<br />
|