My WebLink
|
Help
|
About
|
Sign Out
Home
8H Consent 2011 0919
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2011
>
Packet 2011 0919
>
8H Consent 2011 0919
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2011 5:15:34 PM
Creation date
9/13/2011 5:47:34 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
9/19/2011
Retention
PERM
Document Relationships
_CC Agenda 2011 0919
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 0919
Reso 2011-170
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: Annual Sidewalk Program 2011 -12 <br />PROJECT NO.; 2009.0241 <br />BID NO.: 11- 12.003 <br />BID SUMMARY <br />BID OPENING <br />DATE: Wednesday, August 17, 2011 <br />TIME: 3:00 PM <br />LOCATION: City Clerk <br />ENGINEER'S ESTIMATE <br />Date Approved: 7/7/2011 <br />Prepared by: NT <br />AJW Construction <br />966 81st Avenue <br />Oakland, CA 94621 <br />Phone: 510 - 568 -2300 <br />Fax: 510 -639 -1578 <br />Sposeto Engineering, Inc. <br />4558 Contractors Place <br />Livermore, CA 94551 -4508 <br />Phone: 925- 443 -4200 <br />Fax: 926-443r6800 <br />Phone: <br />Fax: <br />ITEM <br />NO. <br />QUANTITY <br />ITEM <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />10 <br />50 LF <br />Install tack on curb per drawing <br />$32.00 <br />$1,600.00 <br />$20.00 <br />$1,000.00 <br />$30.00 <br />$1,500.00 <br />$0.00 <br />118 case 3101 <br />11 <br />50 LF <br />Install vertical curb per drawing <br />$42.00 <br />$2,100.00 <br />$20.00 <br />$1,000.00 <br />$32.00 <br />$1,600.00 <br />$0.00 <br />118 case 3101 <br />12 <br />40 LF <br />Install cast Iron pipe curb drain <br />$24.00 <br />$960.00 <br />$10.00 <br />$400.00 <br />$16.00 <br />$640.00 <br />$0.00 <br />per drawing 212 case 3101 <br />13 <br />100 SF <br />Remove and reset pavers at <br />$18.50 <br />$1,850.00 <br />$15.00 <br />$1,500.00 <br />$18.00 <br />$1,800.00 <br />$0.00 <br />existing tree per drawing 436 <br />case 3101 <br />14 <br />1 EA <br />Install retrofit frame for tree <br />$1,750.00 <br />$1,750.00 <br />$1,000.00 <br />$1,000.00 <br />$1,250.00 <br />$1,250.00 <br />$0.00 <br />grate in existing concrete per <br />drawing 438A and B case 3101 <br />15 <br />2 EA <br />Install cast in place frame for <br />$1,750.00 <br />$3,500.00 <br />$1,200.00 <br />$2,400.00 <br />$1,320.00 <br />$2,640.00 <br />$0.00 <br />tree grate per drawing 438A and <br />B case 3101. Including steel <br />excluding concrete. <br />16 <br />2 EA <br />Install cast iron tree grate per <br />$1,750.00 <br />$3,500.00 <br />$1,200.00 <br />$2,400.00 <br />$1,200.00 <br />$2,400.00 <br />$0.00 <br />drawing 438A and b case 3101 <br />17 <br />200 SF <br />Remove 4" Concrete and <br />$8.00 <br />$1,600.00 <br />$5.00 <br />$1,000.00 <br />$10.00 <br />$2,000.00 <br />$0.00 <br />backfill with topsoil <br />18 <br />2 Plans <br />Provide traffic control plan and <br />$2,150.00 <br />$4,300.00 <br />$300.00 <br />$600.00 <br />$1,000.00 <br />$2,000.00 <br />$0.00 <br />implement traffic control per <br />section 7- 10.3.3 and 7- 10.3.4 <br />with a flashing arrow panel <br />Bid Summary.xlsx Page 6 of 8 Printed 811712011 @ 4:56 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.