Laserfiche WebLink
9 1 p_ <br />C. Kell-Smith & Associates, Inc. <br />1200 Bayhill Drive, Suite 224 <br />San Bruno, CA 94066 <br />650-827-3900 phone <br />650-827-3909 fax <br />www,kell-smith.com <br />HOMEOWNER PARTICIPATION SUMMARY <br />81 Homes have been insulated to date — (Intro Phase = 10 and Phase I = 71) <br />73 Homes Scheduled in Phase 11 <br />154 Total Homes insulatedischeduled to present date <br />46 Homes + 10 Alternates for Phase III <br />200 Total Homes to be insulated. <br />PHASE II-PROJECT STATUS <br />Phase 11 is composed of 73 homes scheduled for sound insulation. <br />PHASE III <br />There are 46 spots remaining to reach 200 homes. C. Kell-Smith & Associates recommends that <br />an additional 10 homes be held as alternate homes should homeowners drop from participation. <br />Currently 382 Homes are on the Participation List. The breakdown is as follows: <br />192 Homes are within the 56 CNEL contour. <br />30 Homeowners have responded YES on their application. <br />13 Applications have been sent and a response is pending. <br />53 Homes are considered as general candidates. All of them have been solicited on <br />several occasions. <br />2 Properties were foreclosed after the architectural survey was done. <br />30 Homes have existing double pane windows. <br />64 Homes/Homeowners have either answered NO on their application, are not eligible <br />do to existing code issues, or requested to be dropped from Program participation. <br />190 Homes are within the 53-55 CNEL contour. <br />18 Homeowners have responded YES on their application. <br />3 Applications have been sent and a response is pending. <br />163 Homes are considered as general candidates. All of them have been solicited on <br />several occasions. <br />6 Homes/Homeowners have either answered NO on their application, are not eligible <br />do to existing code issues, or requested to be dropped from Program participation. <br />Making Life a Little Quieter with Precision and Caring <br />