Laserfiche WebLink
as requested by the EMS Director. <br />c. Contractor shall participate with the County's Quality Improvement Plan and follow all <br />EMS policies regarding quality improvement and provide appropriate data. <br />SECTION 14 - PENALTY PROVISIONS <br />14.1 Penalties described in this section shall not exceed to total annual FRALS funding, under this <br />agreement. Penalties may be disputed as described in Section 14.7. <br />14.2 Response Time Penalty - Penalties shall be withheld by County from FRALS support funds. <br />a. Contractor shall be penalized anytime Response Time compliance drops below 90% for <br />any calendar month. Response Times for departments with low call volume (less than <br />100 calls per month) shall be evaluated when the Contractor has responded to 100 calls. <br />Once the 100 call level is exceeded, the number of calls to achieve the 100 call threshold <br />will start over in the next month. <br />b. Calculating FRALS response time penalties: <br />• Compliance will be calculated based on combining the Echo, Delta, and Charlie levels <br />of responses and all subareas (Metro /urban, Suburban /Rural, Wilderness). If <br />compliance falls below ninety percent (90 %) the subsidy will be reduced by 10% for <br />the next month. <br />• Compliance for Contractors with low response volume (less than 100 calls per <br />month) will be determined by accumulating the monthly call volume until a total of <br />100 calls is exceeded. Failure of the Contractor to meet the 90% compliance level <br />will result in a 10% reduction of the subsidy for a period equal to the number of <br />months required to exceed the 100 call minimum. For example, if it takes a <br />Contractor three months to respond to more than 100 calls, the penalty deduction <br />will be applied to the next three subsidy payments. Once the 100 call level is <br />exceeded, the number of calls to achieve the 100 call threshold will start over for the <br />next calendar month. <br />c. If FRALS calls are not categorized at the Contractor's dispatch center, compliance will be <br />measured as if all calls are within the ECHO Category. <br />d. If Response Time compliance drops below 90 %, a performance improvement plan <br />must be submitted to the EMS Director with the monthly compliance report. The <br />performance improvement plan must identify each problem that led to the delayed <br />response and the steps being taken to correct each such problem. <br />