My WebLink
|
Help
|
About
|
Sign Out
Home
8C Consent 2011 1017
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2011
>
Packet 2011 1017
>
8C Consent 2011 1017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2011 1:05:53 PM
Creation date
10/12/2011 1:01:42 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
10/17/2011
Retention
PERM
Document Relationships
_CC Agenda 2011 1017
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 1017
Reso 2011-175
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FURNISH AND INSTALL FENCE AND ROLLING GATE <br />AT POLICE DEPARTMENT PARKING LOT <br />Bid No. 11- 12.005 <br />SCOPE OF WORKISPECIFiCATiONS (continued) <br />• Provide and install control conduits from Pump Room at PD to gate and gate controller <br />required to provide for its installation (wiring to be performed by Denalect Alarm under <br />contract with City) <br />• All equipment units shall be mounted using Hilti Kwick Boltz or equivalent <br />• Saw -cut and install all vehicle detector loops and relief cut for the sliding gate ground <br />track <br />• Furnish, install and terminate all control wiring <br />• Bring system up and provide complete operational testing once Denalect has completed <br />their installations <br />• Train designated City personnel in the operation and maintenance of the vehicle access <br />system <br />• Work by any sub - consultant for vehicle access controls shall be coordinated with the <br />fence contractor <br />• Obtain all necessary building permits (cost for permits to be paid by the City) <br />• All work must be coordinated in advance with the City Police Captains <br />• All contractor and subcontractor personnel must wear City - issued ID badges at all times <br />• Contractor must follow all instructions from PD for vacating work area(s) as needed <br />• Total bid price to include all materials, tax, freight, labor and installation <br />PLEASE NOTE THAT THE PROPOSED FINAL LOCATION FOR THE FENCE <br />SHALL BE STAKED IN THE FIELD BY CONTRACTOR AND APPROVED BY <br />THE CITY PRIOR TO THE INSTALLATION OF FENCE POSTS <br />ATTACHED MAP FOR REFERENCE PURPOSES ONLY <br />11- 12.005 PD PARKING LOT FENCE & ROLLING GATE <br />Page 121 <br />
The URL can be used to link to this page
Your browser does not support the video tag.