Laserfiche WebLink
STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION <br /> PROJECT PROGRAMMING REQUEST <br /> DTP -0001 (REV. 6/11) General Instructions <br /> El New Project ❑ Amendment (Existing Project) 1 Date:1 10/18/11 <br /> District EA Project ID PPNO MPO ID TCRP No. <br /> 04 <br /> County Route /Corridor PM Bk PM Ahd Project Sponsor /Lead Agency <br /> ALA SR 185 3.64 3.86 City of San Leandro <br /> MPO Element <br /> MTC Capital Outlay <br /> Project Mgr /Contact Phone E -mail Address <br /> Austine Osakwe 510- 577 -3486 AOsakwe @sanleandro.org <br /> Project Title <br /> SR 185 /Hesperian Blvd /150th Ave Channelization Improvements <br /> Location, Project Limits, Description, Scope of Work, Legislative Description <br /> The project is located in Alameda County in the City of San Leandro at the intersection of SR 185, Hesperian <br /> Blvd and 150th Ave. This project adds an additional left turn lane on northbound Hesperian Blvd to northbound <br /> SR 185, an additional left turn lane on southbound SR 185 to eastbound 150th St and a bus loading lane on <br /> southbound SR 185 between Hesperian Blvd and 150th Street. <br /> Component Implementing Agency Reimbursements <br /> PA &ED Not Applicable <br /> PS &E Not Applicable <br /> Right of Way Not Applicable <br /> Construction City of San Leandro SB 184 <br /> Legislative Districts <br /> Assembly: 18 1 Senate:110 <br /> Congressional: 13 <br /> Purpose and Need <br /> The project will provide adequate capacity to handle the projected traffic volumes for this complicated <br /> intersection. The project improves an intersection that is typically deficient in the Alameda Congestion <br /> Management Plan but qualifies for other exclusions from preparing a remediation plan. The project would be <br /> the remediation plan for the intersection. <br /> Project Benefits <br /> The level of service of the critical movement with the projectted traffic volumes improves from F to D. The <br /> overall intersection delay will be reduced by nine seconds and level of service will be improved from D to C. <br /> Project Milestone Proposed <br /> Project Study Report Approved NA <br /> Begin Environmental (PA &ED) Phase 01/01/03 <br /> Circulate Draft Environmental Document (Document Type (ND /FONSI <br /> Draft Project Report N/A <br /> End Environmental Phase (PA &ED Milestone) 02/01/12 <br /> Begin Design (PS &E) Phase 10/01/09 <br /> End Design Phase (Ready to List for Advertisement Milestone) 11/01/12 <br /> Begin Right of Way Phase 06/01/03 <br /> End Right of Way Phase (Right of Way Certification Milestone) 02/01/13 <br /> Begin Construction Phase (Contract Award Milestone) 06/17/13 <br /> End Construction Phase (Construction Contract Acceptance Milestone) 05/08/14 <br /> Begin Closeout Phase 06/13/14 <br /> End Closeout Phase (Closeout Report) 08/17/14 <br /> ADA Notice For individuals with sensory disabilities, this document is available in alternate formats. For information call (916) 654 -6410 or TDD <br /> 1916) 854 -3880 or write Records and Forms Management. 1120 N Street. MS -89. Sacramento. CA 95814. <br />