Laserfiche WebLink
1 Of I <br />Citv of San Leandro <br />11.3 <br />1011112011 <br />Subn"ed Projects <br />Project Prioties <br />QATranspodatlonNCWTM2010-12 CVVrP-TEP-CMP\PrDjects12012PralectSummaryPdoi&-edreorclered.)ds <br />Tier I Furickrig <br />2012 CWTP <br />C;ounty <br />Shaw <br />Measure <br />ITIP <br />County <br />Share/ <br />T <br />Meas <br />re <br />Local/ <br />Project'Program <br />Project <br />Cost ($M) <br />Description <br />State/ <br />B <br />tDescription <br />Other <br />Funded Phase Description <br />Federal <br />F.: <br />F,atrlaandra Local Sur reti -a£ <br />80 <br />Rehabilitation of local streets and roads to the County PC[ <br />average of 69 <br />15.8AUlarkta, <br />31 <br />31 <br />Interchange reconstruction including bfidge, ramp <br />10 <br />21 <br />Construction <br />RTP if 230066! <br />reconstruction, converting the interchange into a <br />conventional partial cloverleaf with signalized foot-of-ramp <br />intersections <br />33 <br />32 <br />1 <br />Interchange reconstruction including bridge, ramp <br />10 <br />23 <br />Construction <br />I <br />reconstruction, Westgate Parkway Connection and <br />1 <br />Signatizaticri Improvements. <br />Ddswtttarrn SariLeandro"TOD <br />70 <br />70 <br />Pedestrian, bicycle, streetscape, transit center and parking <br />7 <br />63 <br />Construct & Leandro Blvd <br />improvements to Support Transit Oriented Development. <br />Streetscape Improvements <br />iJuana <br />Streetscape improvements on San Leandro Blvd arid West <br />I <br />Avenue <br />E are Tlt-15M Avw'. <br />3.1 <br />2.1 <br />1 <br />Project vall construct street improvement 10 increase the <br />2 <br />1 <br />Construction <br />2MLcJ1 of the intersection. <br />E StreeMcaM,.;.:: <br />8.3 <br />8.3 <br />Streetscape Improvement along East 14th St to <br />8 <br />Design <br />encourage mixed used devokipmea Enhancements to <br />streets and sidewalks to be more pedestrian friendly and <br />conducive to walking, biking and using transit <br />. SantearnfirwSUeetscape . d: <br />: <br />10 <br />9 <br />1 <br />Pedestrian, bicycle, streetscape, transit center, traffic <br />9 <br />1 <br />Design and ConMuctJon of <br />Peidestriaiiinipiro"ve'nwrit <br />I <br />Safety, Signal and parking improvements 10 Support Transit <br />Streetscape Improvements <br />Oriented Development along major travel corridors in San <br />i <br />Leandro including WcArthur Blvd, Marina Blvd, Doolittle <br />Lake GhabatPbad!SMbft <br />10 <br />9 <br />Road embankment: Stabilization from Chabot Terrace to <br />1 <br />0 <br />Design <br />Astor Dr <br />30! <br />Eden Road, Marina Blvd Widening from Teagarden to <br />4 <br />26 <br />Construct Eden Road <br />Alvarado, Polvomsa Ave extension, and new Wt crossing <br />at east end of Aladdin Ave and its intersection with <br />iwashincrton Ave. Leivelling-Washinglon Ave Improvements <br />EastBay:8--a%&q. Raft <br />100 <br />10 <br />1 <br />Install proposed pedestrian and bicycle path adjacent to <br />10 <br />1 <br />to irAi,' J <br />Ficlht -of <br />Union �M <br />T-ft Upgrade <br />2 <br />2 <br />New controllers, detection and communication for all <br />2 <br />Design and Construction <br />signals and implementation of Adaptive Traffic Control on <br />critical corridors of Hesperian BE, Washington Ave, San <br />Leandro Blvd, Marina Blvd, Merced St and Alvarado St. <br />70 <br />70 <br />Pedestrian, bicycle, streetscape, transit center and parking <br />4 <br />66 <br />Construct Area Streetscape <br />improvements to aepRrt Transit Oriented Development <br />Im provements <br />Washington-I. Aiwelfing <br />2 <br />1 <br />1 <br />An intersection safety project that will improve road <br />2 <br />0 <br />Construction <br />Intersection <br />alignment, remove "pork-chop' island, install new signal <br />San Leandro RR Underpass <br />40 <br />40 <br />Underpass widenings on Washington Ave and San <br />4 <br />36 <br />Design <br />Improvements <br />Leandro BM (Oakland) and new Underpass at Hespeiian <br />81 <br />Reconstruct interchange connections to enhance <br />4 <br />4S <br />Design <br />interohange/Lewelling <br />linterchange <br />I !141 <br />operations and truck movements, and complement 1-238 <br />I <br />Widening Project, including widening overhindercrossiM <br />11.3 <br />1011112011 <br />Subn"ed Projects <br />Project Prioties <br />QATranspodatlonNCWTM2010-12 CVVrP-TEP-CMP\PrDjects12012PralectSummaryPdoi&-edreorclered.)ds <br />