My WebLink
|
Help
|
About
|
Sign Out
Home
8J Consent 2011 1205
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2011
>
Packet 2011 1205
>
8J Consent 2011 1205
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2012 5:23:18 PM
Creation date
11/29/2011 5:09:17 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
12/5/2011
Retention
PERM
Document Relationships
_CC Agenda 2011 1205
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 1205
Reso 2011-199
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File Number: 11 -365 <br />remain operational without interruption from collisions, repair costs will be reduced and <br />safety will be enhanced. It costs the City approximately $15,000 to repair the box each time <br />it is hit. <br />This maintenance project will relocate the traffic control box from its current location at the <br />curb on the northeast corner of 143rd and Washington Avenues to a concrete pad behind <br />the sidewalk. The proposed location for the signal controller box is approximately ten feet <br />away from its current location, just outside of the existing public right -of -way in the adjacent <br />landscape area, and therefore property must be acquired. <br />Committee Review and Actions <br />At its November 8, 2011 meeting, the Facilities and Transportation Committee <br />recommended that the full Council approve this action. <br />Applicable General Plan Policies <br />16.03 MAINTENANCE: Regularly maintain City streets and traffic control devices to ensure <br />that streets operate safely and efficiently. <br />Environmental Review <br />This activity is categorically exempt pursuant to CEQA section 15301(b) and (c). <br />15301. Existing Facilities Class 1 consists of the operation, repair, maintenance, <br />permitting, leasing, licensing, or minor alteration of existing public or private structures, <br />facilities, mechanical equipment, or topographical features, involving negligible or no <br />expansion of use beyond that existing at the time of the lead agency's determination. (b) <br />Existing facilities of both investor and publicly -owned utilities used to provide electric power, <br />natural gas, sewerage, or other public utility services; (c) Existing highways and streets, <br />sidewalks, gutters, bicycle and pedestrian trails, and similar facilities (this includes road <br />grading for the purpose of public safety). <br />Fiscal Impacts <br />This acquisition will cost approximately $3,000 and will be funded by existing appropriation in <br />Account 210 -18 -132, Public Works Maintenance Projects. <br />Budget Authority <br />The Finance Director has reviewed and approved the funding for this action. <br />PREPARED BY: Tara Peterson, Administrative Services Manager, Engineering & <br />Transportation Department <br />City of San Leandro Page 2 Printed on 11/29/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.