Laserfiche WebLink
2450 WASHINGTON AVENUE <br />DRAFT MITIGATION MONITORING AND REPORTIITG PLAN <br />IMPACT <br />MITIGATION MEASURES REQUIRED <br />M <br />ON <br />TORING <br />TIMING <br />1iES$ <br />!.NSIBILITY <br />Cultural Resources 1I <br />I H <br />Sato k. The o'ect ma <br />pr) y <br />Mitigation Measure #10: The applicant shall cease any grading or <br />Comm <br />�fy Development <br />At such time as <br />cause a substantial adverse <br />construction activities and shall consult with appropriate representatives <br />Dep <br />� ent <br />resources are <br />change in the significance of <br />of the Native American Heritage Commission if human remains are <br />discovered during <br />an archeological resource or <br />discovered, in accordance with State Law and Section 7050.5 of the <br />excavation or <br />directly or indirectly destroy <br />Health and Safety Code, Section 150645 (e) of the State CEQA Guidelines <br />construction activities. <br />a unique paleontological <br />and Section 5097.98 of the Public Resources Code. <br />resource or site or unique <br />geologic feature or disturb <br />human remains. <br />Geolo /Soils <br />lief <br />6 a, ii., iii, b, c, d. Expose <br />Mitigation Measure #11: The City of San Leandro has incorporated the <br />(ding Official <br />Prior to issuance of <br />people or structures to <br />2009 International Building Code into its municipal building code (Title 7, <br />Building Permits <br />potential substantial adverse <br />Chapter 7 -5). The project applicant would be required to comply with all <br />effects, including the risk of <br />applicable State and City regulations to address potential geologic hazards <br />Ioss, injury or death <br />associated with the proposed project, including ground shalang and <br />involving a rupture of a <br />liquefaction. Geotechnical and seismic design criteria must conform to <br />known earthquake fault, <br />engineering recommendations in accordance with the seismic <br />strong seismic ground <br />requirements of the 2010California Building Code (Title 24) and any <br />shaking, unstable soils or <br />amendments adopted in the San Leandro Municipal Code. Additionally, <br />expansive soils. <br />because the project site is in a liquefaction Seismic Hazard Zone, the <br />project applicant will be required to comply with the guidelines set forth <br />by California Geological Survey Special Publication 117. <br />Mitigation Measure #12: Applicant shall comply with the NPDES <br />City <br />E <br />guieering Department <br />Prior to issuance of <br />requirements that must incorporate permanent post - construction Best <br />Grading Permit <br />Management Practice (BMP) of the California Regional Water Quality <br />Control Board and the City of San Leandro Building and Engineering <br />Departments. The BMP shall be reviewed and approved by the City's <br />Engineering Department prior to the issuance of a Grading Permit. <br />Geology/Soils (Continued) <br />Mitigation Measure #13: Applicant shall be required to completely <br />City <br />Eng <br />peering Department <br />Prior to issuance of <br />remove all existing surface and subsurface structures prior to grading. If <br />Gradin g Pmnn# <br />3 <br />