My WebLink
|
Help
|
About
|
Sign Out
Home
8D Consent 2011 1219
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2011
>
Packet 2011 1219
>
8D Consent 2011 1219
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2011 9:36:33 AM
Creation date
12/13/2011 6:21:27 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
12/19/2011
Retention
PERM
Document Relationships
_CC Agenda 2011 1219
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 1219
Reso 2011-208
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
payment shall be in addition to any other remedies herein provided or available under <br />applicable law, including the right to terminate the contract. <br />(e) if in the opinion of the City there are repeated and/or frequent Contractor deficiencies, the <br />contract may be terminated. <br />Reduction in Scope — The City reserves the right to reduce the scope of work up to 50% of the total <br />monthly bid. Should any reduction be necessary the contractor shall receive thirty (30) days notice. The <br />remaining areas of contractor responsibility shall be paid at the rate bid by the contractor for those items. <br />Any reduction in excess of 50% of total monthly bid shall be made within sixty (60) days notice. For <br />reductions in excess of 50 %, Contractor shall have the option to either accept the remaining items at their <br />bid rate or to terminate the agreement. Notice of termination by Contractor under these circumstances shall <br />be given to the city in writing at least forty -five (45) days before agreement termination. <br />Communication with City <br />Contractor shall designate one person as the representative of Contractor authorized to act on its behalf <br />with respect to this specified work. <br />The City of San Leandro, through a designated representative, shall make inspections on a weekly basis, <br />or as often as necessary to insure that complete and continuous maintenance is fulfilled. In addition, the <br />City may obtain the services of an approved horticultural specialist to inspect plantings and make <br />recommendations for improvements in the maintenance program. <br />Contractor shall be required to attend bi- weekly meetings with City staff to review Contractor's performance <br />and the condition of all maintenance areas. Dates and times of meetings shall be set by the City and the <br />Contractor. These monthly meetings are not to substitute for Contractor's responsibility to regularly inspect <br />areas. <br />The Contractor shall submit weekly inspection reports signed by the Contractor's representative that shows <br />that all areas have been inspected that week, which areas are out of conformance with these specifications <br />and the Contractor's plans for bringing the areas into specification conformance. <br />The Contractor shall submit a written report each month stating all contract work completed. The report <br />shall show the work completed during each week contract work was accomplished, and shall be submitted <br />with and cover the same work as the Contractor's billing statement for the previous month's work. The <br />report shall include documentation of aeration, fertilization and chemical applications. Failure to submit <br />reports by the tenth of each month shall result in the Contractor forfeiting $500 from any amounts owed by <br />the City. <br />Emergencies <br />Contractor shall be responsible for responding to all emergencies within two (2) hours of notification during <br />the hours of 7:00 a.m. to 5:00 p.m., Monday through Friday. <br />Change Orders <br />If the City makes any other substantial change to the landscaping in a contract area, the City and <br />Contractor shall negotiate any necessary adjustments to the monthly maintenance contract. The City <br />reserves the right to remove any area from the maintenance contract if agreement cannot be reached. <br />NPSA 51517- Citywide Landscape - Pacheco Brothers Page 14 of 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.