My WebLink
|
Help
|
About
|
Sign Out
Home
8D Consent 2011 1219
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2011
>
Packet 2011 1219
>
8D Consent 2011 1219
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2011 9:36:33 AM
Creation date
12/13/2011 6:21:27 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
12/19/2011
Retention
PERM
Document Relationships
_CC Agenda 2011 1219
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 1219
Reso 2011-208
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
using barricades or traffic cones to alert the public to the existence of hazards, and replacing valve box <br />covers. <br />Pedestrian travel shall be maintained at all times along both sides of all streets or streets where work as <br />part of this contract is being performed. All temporary pedestrian walkways shall be at least four (4) feet <br />wide and fully accessible to handicapped pedestrians. In all cases, pedestrian walkways shall be separated <br />from vehicular traffic by a clear area of at least six (6) feet. <br />Fuel Conservation and Low Emission Equipment <br />The Contractor shall implement strategies in work operations to reduce fossil fuel consumption and <br />emissions such as: use hand powered equipment when possible; minimize use of gas - powered blowers; <br />select the smallest, most fuel - efficient equipment to accomplish the work; consider vehicles that operate on <br />natural gas or biodiesel; maintain equipment properly and keep it well - tuned; and emphasize employee <br />carpooling to jobsites. All blowers shall be four - stroke (4 stroke) to help reduce noise complaints. <br />Use Local Products and Supplies <br />The Contractor shall use local products and suppliers to the extent possible to minimize fuel consumption <br />and emissions. <br />Equipment Refuelinq and Repair <br />The Contractor shall refuel and repair equipment in a safe manner to protect against accidental spills. Limit <br />refueling to specific and limited areas on a site. Measures shall be taken to prevent, control, and clean -up <br />spills. Clean -ups shall be immediate, automatic and routine and performed by a trained staff member or a <br />licensed cleaning company. Contact the local emergency response team agencies to report all minor or <br />major spills. Contractor shall be aware of and abide by Spare -the Air Day fueling advisories. <br />Lost and Found <br />Personal property found by the Contractor on City property or in public right -of -way shall be reported to the <br />City. <br />NPSA 51517- Citywide Landscape - Pacheco Brothers Page 22 of 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.