My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2011-207
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2011
>
Reso 2011-207
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2014 11:27:41 AM
Creation date
12/21/2011 5:02:49 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
12/19/2011
Retention
PERM
Document Relationships
3C Public Hearing 2011 1219
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 1219
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Install alert and warning systems for rapid or shelter -in -place (GOVT -c -14) - The City has <br />contracted with CodeRed, a nationally recognized automated telephone and text message system <br />that can notify affected portions of the community, or the entire community when emergency <br />alerts or notifications are needed. Additionally, the City is in discussions with a second television <br />programming provider (AT &T U- verse) to establish a Government Access television channel <br />which will permit broadcast of emergency messages and alerts. <br />Future Mitigation Actions and Priorities <br />As a participant in the 2010 ABAG multi jurisdictional planning process, the staff of the City of <br />San Leandro helped in the development and review of the comprehensive list of mitigation <br />strategies in the overall multi jurisdictional plan. The decision on priority was made based on a <br />variety of criteria, not simply on an economic cost - benefit analysis. These criteria include being <br />technically and administratively feasible, politically acceptable, socially appropriate, legal, <br />economically sound, and not harmful to the environment or our heritage. <br />These draft strategies were submitted to the San Leandro City Council for review on September <br />21, 2009. The draft strategies will be provided to the City Council for adoption pending approval <br />of this LHMP by FEMA. <br />The City also anticipates completion of a number of mitigation tasks over the next 5 years. This <br />list includes implementation process, funding strategy, responsible agency, and approximate time <br />frame. <br />The proposed projects include the following: <br />Retrofit of Seismically- deficient Road Strictures — Replacement of two major highway <br />overcrossings. <br />• Economic Analysis: Significant risk to life safety and economic stability of the <br />community should two overcrossings over Highway 880 fail. <br />• Responsible Department: Engineering & Transportation <br />• Funding Source: a combination of State Proposition 1B funds for highway safety and <br />traffic reduction projects, and Federal LATIP funds. <br />• Timeframe: Construction to begin in 2011 <br />• Mitigation Strategy Number: Infr -B -1 <br />Participation in Interoperable Communications System — A P25 compliant communications <br />systems with region wide interoperability. <br />• Economic Analysis: Risk analysis and economic loss demonstrated the need for <br />proposed investment in a regional program. <br />• Responsible Department: City Manager's Office, Police Department and Public Works <br />Department <br />• Funding Source: City General Funds and any grant funds which can be identified and <br />secured <br />• Timeframe: Complete operability targeted for FY 2013 <br />• Mitigation Strategy: Govt -C -7 <br />2010 Local Hazard Mitigation Plan 10 December 21, 2011 <br />City of San Leandro Annex <br />
The URL can be used to link to this page
Your browser does not support the video tag.