Laserfiche WebLink
Specific Mitigation Strategy <br />IN FR - a - Muffi-H azardt ommed by the inft-astructure provider <br />&-I <br />Assess the vu In erability of critical facilities. owned by <br />EQ <br />."s through stockpiling of shoring materials, <br />infrastructure Operators subject to damage in <br />LS <br />FL <br />natural disasters of security threats, including fuel <br />VVIF <br />able through the Water NVastewater Agency <br />tanks and M ci lities owned outside of the Bay Area <br />F L <br />SEI <br />that can i mpact service delivery within the region. <br />funded, Very High, <br />1E o- S <br />Note - Infrastructure agencies, departmenis, and <br />SEl <br />districts are those that operate transportation and <br />2 <br />EL <br />utility facilities and networks- <br />> <br />a-2 <br />lfa dam wener, comply with State ofCa[ifornia and <br />EQ <br />federal requirements to assess the vulnerability Of <br />LS <br />dams to damage from earthquakes, seiches, <br />WF <br />landslides, liquefaction, or security threats. <br />FL <br />Du rage the cooperation of utility system EQ <br />clers and cities, counties, and special dstdct% LS <br />PG&E to develop strong and effective VVF <br />lation strategies For infrastructure systems and <br />ties- FL <br />DR <br />t or replace critical hrelme infrastructure EC <br />s andfor their backup facilities that are LS <br />to be vulnerable to damage in natural WF <br />ors. <br />FL <br />trt ana encourage arrons ororneF fune LU <br />ructure) agencies as they plan for and LS um <br />le financing for seismic retrofits and other city VVF <br />ar mitigation strategies. (For example. a c <br />pass a resolution in support of a transit <br />FL <br />Y's retrofit program-) DR <br />dots a plan for speeding the repair and <br />EQ <br />jonal restoration ofwater and wastewater <br />LS <br />."s through stockpiling of shoring materials, <br />VVF <br />crary pumps, surface pipelines. portable <br />FL <br />ants. and other supplies, such as those <br />'a All <br />able through the Water NVastewater Agency <br />DR <br />ronse Network (WARN). Communicate that <br />SEI <br />to local governments and critical facility <br />funded, Very High, <br />Infrastructure Mitigation Strategies <br />out this form, including a city, county, or special distfict), <br />i of 11 <br />V,4IQJ <br />Responsible Agency Ordinance or Resolution # (if existing <br />E <br />or Department <br />program), Estimated Cost and <br />(Required if Existing <br />E <br />E <br />'a All <br />priorltyi, Estimated Date of <br />t -o <br />Program under <br />CompJ@tjGnyfs1udy), WHY ifna1: <br />U1 <br />funded, Very High, <br />1E o- S <br />z J Hgh, or Under Study-) <br />comments <br />i En gineerin g and <br />2 <br />EL <br />� <br />Cl 0 M <br />> <br />Z, <br />-g <br />Improvement Projects move <br />!forward. <br />C <br />L <br />C <br />3 E C <br />Jg <br />dos <br />0 OL z2 <br />II <br />LU <br />M <br />L�u s <br />:S .3 '. 0. <br />'t o <br />z 0 <br />out this form, including a city, county, or special distfict), <br />i of 11 <br />V,4IQJ <br />1) <br />Manager i PG E, ESM U D and AT"T are <br />members of San Leandro <br />I Disaster Council and n., whir <br />!City officials periodically to <br />lidscuss utility system protections. <br />9 <br />infrastructure facilities (i-@- sower <br />systems) are being replaced- <br />nager <br />Works and Project has been completed- <br />!ering & <br />Responsible Agency Ordinance or Resolution # (if existing <br />or Department <br />program), Estimated Cost and <br />(Required if Existing <br />Possible Funding Agency (if high <br />g? <br />Program. Existing <br />priorltyi, Estimated Date of <br />t -o <br />Program under <br />CompJ@tjGnyfs1udy), WHY ifna1: <br />w <br />funded, Very High, <br />same as regional. pri", OR Other <br />z J Hgh, or Under Study-) <br />comments <br />i En gineerin g and <br />!Most critical facilities have been <br />Transportation <br />lwismically strengthened; others <br />!are brought up to code as Capital <br />Improvement Projects move <br />!forward. <br />1) <br />Manager i PG E, ESM U D and AT"T are <br />members of San Leandro <br />I Disaster Council and n., whir <br />!City officials periodically to <br />lidscuss utility system protections. <br />9 <br />infrastructure facilities (i-@- sower <br />systems) are being replaced- <br />nager <br />Works and Project has been completed- <br />!ering & <br />