My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2011-207
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2011
>
Reso 2011-207
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2014 11:27:41 AM
Creation date
12/21/2011 5:02:49 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
12/19/2011
Retention
PERM
Document Relationships
3C Public Hearing 2011 1219
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 1219
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Infrastructure Mitigation Strategies <br />e-i <br />Include "areas subtect to ground failure in the list of <br />Ft <br />criteria used Par determining a replacement <br />EQ <br />schedule (along with importance, age, type of <br />special districts of private utility companies <br />construction material, size, condition, and <br />maintenance or repair history) for pipelines- <br />Responsible Agency j ordinance or Resolution # (if existing <br />s <br />Building Occupancy Resumption Program (BORP). <br />v <br />steep slopes that are Iikety to lead to excessive <br />M v_ <br />road maintenance or where roads will be difficult to <br />hire qualified engineers to create facility - specific <br />`o <br />or Department program), Estimated Cost and <br />engineers to become automaticaliy deputized as <br />�' <br />0 � ° <br />� 0 0 <br />(Required if Existing Possible Funding Agency (if high <br />c' <br />Specific Mitigation Strategy <br />EL <br />a <br />yr <br />E <br />,2 <br />` <br />m <br />u <br />Program, Exlsikhg priority), Estlmated bate of <br />d' <br />\ <br />'i <br />i 11 <br />Program under completion of sludyl. WHY if not <br />\\ <br />\ \ \ <br />'t3 <br />>. o i .� <br />a <br />funded. Very High, same as. regional priority, OR Other <br />W <br />Lu c <br />3 :S m F Q. <br />2 € . <br />4 <br />Z 4 i3 <br />z {} <br />9h, or Cinder Study) 1 Comments <br />[mpg - <br />r -I. doId- <br />e-i <br />Include "areas subtect to ground failure in the list of <br />Ft <br />criteria used Par determining a replacement <br />EQ <br />schedule (along with importance, age, type of <br />special districts of private utility companies <br />construction material, size, condition, and <br />maintenance or repair history) for pipelines- <br />e-2 <br />Establish requirements in zoning ordinances to <br />Building Occupancy Resumption Program (BORP). <br />address hillside development constraints in areas of <br />steep slopes that are Iikety to lead to excessive <br />road maintenance or where roads will be difficult to <br />hire qualified engineers to create facility - specific <br />maintain during winter storms due to Iandsllding. <br />IN FR - f- Building Reoccupancy <br />Ft <br />Ensure that critical buildings Owned or leased by <br />EQ <br />special districts of private utility companies <br />LS <br />participate in a program similar to van Francisco's <br />y q F <br />Building Occupancy Resumption Program (BORP). <br />FL <br />The BORP program permits owners ofbuildngsto <br />hire qualified engineers to create facility - specific <br />SEI <br />post- disaster inspection plans and allows these <br />engineers to become automaticaliy deputized as <br />City(County inspectors for these buildings in the <br />event of an earthquake or other disaster. This <br />program allows rapid reoccupancy of the. buildings. <br />Note -A qualified engineer is a California licensed <br />engineer with relevant experience. <br />IN FR - g.- Public Education <br />g-t Provide materials to the public miabed to planning EQ <br />for power outages- LS <br />VVF <br />FL <br />SEI <br />g-2 Provide materials to the public related to family and Erb <br />persona[ planning for delays due to traffic or road LS <br />closures, or due to transit system disruptirui caused VVF <br />by disasters. <br />FL <br />ide materials to the public. €elated to coping ECG <br />reductions in water suppity OF contamination of LS <br />supply BEYOND regulatory notification WIF <br />irernents. <br />FL <br />DR <br />10 ofli <br />g and !Standard procedure <br />Standard procedure <br />Standard procedure <br />eager ,atanoaro procedure <br />nager ;This can be considered for fixture <br />;planning. <br />nager Standard Procedure <br />
The URL can be used to link to this page
Your browser does not support the video tag.