Laserfiche WebLink
File Number: 11 -449 <br />solution are: <br />• Ability to retain notes taken at meetings electronically for future use <br />• Timely distribution of the agenda and ability to retrieve and review agenda anytime, <br />anywhere <br />• Ability to include larger, more voluminous documents in the agenda packet <br />• Ability to enlarge print and images onscreen for ease of reading (maps and statistical <br />reports) <br />• Photos, charts, graphs, maps, etc., can be displayed in color and with better clarity <br />• Reduce paper costs (100,000 sheets annually) and staff time (114 hours annually) in <br />copying and delivering (mail will not be delivered; it will be picked up at City Hall) <br />• Other reference documents such as the Council Handbook could be loaded on the <br />iPad thus further reducing reproduction costs, and providing access to most civic <br />documents via a single device <br />The new Agenda Management system has a comprehensive on -line filing system that <br />incorporates staff reports, legislation, attachments, minutes and audio files from recorded <br />meetings. This system will be available to Council, staff and the community for Council <br />meetings and work sessions from October 2011 forward. Beginning in 2012, staff will begin <br />a phased implementation of on -line agendas, attachments and minutes /highlights for Council <br />Committee and Board and Commissions meetings. iPads will be able to take advantage of <br />this new functionality from wherever wi -fi connectivity is available. <br />Wi -fi connectivity is limited at the Civic Center to the Council Chambers and City Manager's <br />Large Conference Room. Implementing a centrally managed wi -fi network to all buildings in <br />the Civic Center complex and Public Works Administration would provide flexibility for <br />meetings where wireless is required; provide wireless access to the public when doing <br />business with the City; reduce installation costs for departments wishing to install public PCs <br />with internet connectivity and reduce staff time in maintaining multiple wi -fi hot spots. <br />The total cost of this project will not exceed $43,400. Each iPad will cost $880 per user <br />which includes an iPAD with Wi -fi and 3G capability, an extra adapter and iAnnotate <br />software. The cost to install a Civic Center Public Wi -Fi Network will be $24,000 with an <br />annual maintenance cost of $1,800. <br />The proposed project would be voluntary by City Council. For Councilmembers wishing to <br />continue to receive a paper copy, the agenda packet will be available at City Hall after 1:00 <br />p.m. on Wednesdays. <br />Committee Review and Actions <br />The City Council Rules and Communications Committee discussed this matter at the <br />September 29 and November 1, 2011 meetings, and forwarded a recommendation to the <br />City Council to implement a voluntary paperless agenda program, and expand the Civic <br />Center Wi -Fi Network. <br />Fiscal Impacts <br />Depending on the number of Councilmembers wishing to participate, the proposed <br />hardware, software and network costs will not exceed a one -time cost of $41,600. There will <br />City of San Leandro Page 2 Printed on 111012012 <br />