My WebLink
|
Help
|
About
|
Sign Out
Home
FacilitiesTransportation Highlights 2012 0110
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2012
>
Packet 2012 0206
>
FacilitiesTransportation Highlights 2012 0110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 10:01:18 AM
Creation date
1/31/2012 5:10:00 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Committee Highlights
Document Date (6)
1/10/2012
Retention
PERM
Document Relationships
_CC Agenda 2012 0206 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2012\Packet 2012 0206
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
On-going Construction, Cont'd. <br />■ Annual Street Sealing 2010-2011 Project <br />• Surface maintenance treatment with cape seal, double chip <br />seal, microsurfacing and slurry <br />• Use of recycled rubber (PMAR) — Recycled over 9,250 tires <br />• Pavement Maintenance Area — 2011 <br />• Start of Construction — Summer 2011 <br />• Construction Work Status — Punch list <br />• Completion—April 2012 <br />On-going Construction Contd. <br />Marina Boulevard Street Rehabilitation <br />• Funding— Federal Grant and Measure B <br />• Limits: <br />• Alvarado to Teagarden <br />• 4" Asphalt Concrete Inlay Paving <br />• San Leandro Blvd. to Washington Ave. <br />• Cement Treated Base Paving <br />• Start of Construction — October 3, 2011 <br />• Construction Work Status -- Punch list <br />• Completion —January 2012 <br />1/10/2012 <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.