Laserfiche WebLink
On-going Construction, Cont'd. <br />■ Annual Street Sealing 2010-2011 Project <br />• Surface maintenance treatment with cape seal, double chip <br />seal, microsurfacing and slurry <br />• Use of recycled rubber (PMAR) — Recycled over 9,250 tires <br />• Pavement Maintenance Area — 2011 <br />• Start of Construction — Summer 2011 <br />• Construction Work Status — Punch list <br />• Completion—April 2012 <br />On-going Construction Contd. <br />Marina Boulevard Street Rehabilitation <br />• Funding— Federal Grant and Measure B <br />• Limits: <br />• Alvarado to Teagarden <br />• 4" Asphalt Concrete Inlay Paving <br />• San Leandro Blvd. to Washington Ave. <br />• Cement Treated Base Paving <br />• Start of Construction — October 3, 2011 <br />• Construction Work Status -- Punch list <br />• Completion —January 2012 <br />1/10/2012 <br />3 <br />