My WebLink
|
Help
|
About
|
Sign Out
Home
FacilitiesTransportation Highlights 2012 0110
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2012
>
Packet 2012 0206
>
FacilitiesTransportation Highlights 2012 0110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 10:01:18 AM
Creation date
1/31/2012 5:10:00 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Committee Highlights
Document Date (6)
1/10/2012
Retention
PERM
Document Relationships
_CC Agenda 2012 0206 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2012\Packet 2012 0206
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1/10/2012 <br />Other Ongoing Projects <br />■ East 14th St./Hesperian Blvd./150th Ave. Intersection Improvements <br />■ Phasing— <br />➢ 14901 East 14th Street Demolition <br />— Demolish existing building structure to make way for intersection <br />Improvements <br />— Start of Demolition — February 2012 <br />➢14401 East 14th Street Remediation <br />- Site remediation following Demolition project under a separate contract <br />➢ Intersection Improvements <br />-- Design Continues <br />— Right of Way Acquisition <br />— Fund Transfer from Westgate Parkway <br />— Construction —Summer 2014 <br />■ Street Light Undergrounding-- East 141h Street (150th to South City Limits) <br />• Phases— Procurement and Construction <br />• Start of Procurement — 3"r Week of September 2011 <br />• Start of Construction —February 2012 <br />• Complete Construction —Summer 2012 <br />Upcoming Projects <br />BART -Downtown Pedestrian Improvements <br />• Streetscape improvements along San Leandro Boulevard between Davis Street and <br />WIIliamsStreet <br />• Funding-- Federal Grants <br />• Status — In design <br />• Construction — Fall 2012 <br />• Americans with Disabilities Act (ADA) Ramps 11-12 <br />• Installation of ADA -compliant ramps at select intersections <br />• Start of Construction — November 2011 <br />■ 2010 ADA Transition <br />• Modification to public -use areas of City facilities to bring them into conformance with <br />Americans with Disabilities Act (ADA) requirements for accessibility <br />• Funding— CDBG & General Fund <br />• Multl-year project <br />• Status — Preliminary design <br />
The URL can be used to link to this page
Your browser does not support the video tag.