Laserfiche WebLink
PROJECT TITLE: Bancroft Avenue and 136th Avenue Traffic Signal <br />PROJECT NO.: 11- 160 -38 -330 <br />BID NO.: 11- 12.008 <br />BID SUMMARY <br />This document is a summary of bids received for the subject project and are provided <br />only as a convenience. Listing of a particular bid is not a finding that such bid has <br />been found to be responsive or accepted as complete by the City. An award of <br />contract, if any, is subject to approval of the City Council and/or the City Manager. <br />Contractors should refer to the contract documents for bidding information. <br />BID OPENING <br />ENGINEER'S ESTIMATE <br />Amland Corp <br />Columbia Electric, Inc. <br />W. Bradley Electric, Inc. <br />DATE: Wednesday, January 11, 2012 <br />Date Approved: 11/7/2011 <br />3168 Knights Bridge Road <br />1980 Davis Street <br />90 Hill Road <br />TIME: 3:00 PM <br />Prepared by: NL <br />San Jose, CA 95132 <br />San Leandro, CA 94577 <br />Novato, CA 94945 <br />LOCATION: City Clerk or Finance <br />Phone: 408 -929 -3949 <br />Phone: 510- 430 -9505 <br />Phone: 415 - 898 -1400 <br />Fax: 408 -298 -4344 <br />Fax: 510-430-1860 <br />Fax: 415-493-2559 <br />ITEM <br />NO. <br />QUANTITY <br />ITEM. <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />14 <br />1 EA <br />Repair Damaged Existing <br />$2,000.00 <br />$2,000.00 <br />$550.00 <br />$550.00 <br />$3,900.00 <br />$3,900.00 <br />$2,000.00 <br />$2,000.00 <br />Conduit (Up to 5' in Depth) <br />15 <br />1 EA <br />Repair Damaged Existing <br />$5,000.00 <br />$5,000.00 <br />$1,000.00 <br />$1,000.00 <br />$6,500.00 <br />$6,500.00 <br />$6,000.00 <br />$6,000.00 <br />Conduit (From to 5' to 13' Deep) <br />16 <br />1 EA <br />Sheeting, Shoring & Bracing <br />$2,500.00 <br />$2,500.00 <br />$550.00 <br />$550.00 <br />$900.00 <br />$900.00 <br />$2,500.00 <br />$2,500.00 <br />(For Work Associated with Bid <br />Item No. 15) <br />17 <br />40 CY <br />Roadway Excavation and <br />$50.00 <br />$2,000.00 <br />$200.00 <br />$8,000.00 <br />$203.50 <br />$8,140.00 <br />$185.00 <br />$7,400.00 <br />Offhaul <br />18 <br />3 EA <br />Adjust Sanitary Sewer and <br />$1,500.00 <br />$4,500.00 <br />$1,000.00 <br />$3,000.00 <br />$1,320.00 <br />$3,960.00 <br />$1,200.00 <br />$3,600.00 <br />Storm Water Manhole Frame <br />and Cover to Grade <br />19 <br />80 TN <br />Asphalt Concrete Paving <br />$100.00 <br />$8,000.00 <br />$300.00 <br />$24,000.00 <br />$330.00 <br />$26,400.00 <br />$300.00 <br />$24,000.00 <br />20 <br />3 EA <br />Adjust Water Valve Pot Frame <br />$650.00 <br />$1,950.00 <br />$300.00 <br />$900.00 <br />$374.00 <br />$1,122.00 <br />$340.00 <br />$1,020.00 <br />and Cover to Grade <br />- <br />TOTAL BASE BID: $317,187.23 <br />$321,200.00 <br />$325,563.80 ** <br />$379,060.00 <br />SUBCONTRACTORS: <br />Diaz Corp. <br />Chrisp Company, Contra Costa <br />Bayside Stripe, Sposeto Eng. <br />Electric, Sposeto Engineering, Inc. <br />SECURITIES: <br />10% Bid Bond <br />10% Bid Bond <br />10% Bid Bond <br />NOTES: <br />** Math Error Corrected <br />Reviewed by: <br />Nelson Project Manager <br />Reviewed by: <br />f Osakwe, Senior Engineer <br />Bid Summary.xlsx <br />Date: <br />Date: l r1. <br />Page 2 of 6 <br />Printed 1!12!2012 0 9:00 AM <br />