BID SUMMARY
<br />® rp no� -i
<br />PROJECT TITLE: Bancroft Avenue and 136th Avenue Traffic Signal
<br />PROJECT NO.: 11- 150 -38 -330
<br />BID NO.: 11- 12.008
<br />BID OPENING
<br />DATE: Wednesday, January 11, 2012
<br />TIME: 3:00 PM
<br />LOCATION: City Clerk or Finance
<br />ITEM
<br />NO. QUANTITY ITEM
<br />14 1 EA Repair Damaged Existing
<br />Conduit (Up to 5' in Depth)
<br />15 1 EA Repair Damaged Existing
<br />Conduit (From to V to 13' Deep)
<br />16 1 EA Sheeting, Shoring & Bracing
<br />(For Work Associated with Bid
<br />Item No. 15)
<br />17 40 CY Roadway Excavation and
<br />Offhaul
<br />18 3 EA Adjust Sanitary Sewer and
<br />Storm Water Manhole Frame
<br />and Cover to Grade
<br />19 80 TN Asphalt Concrete Paving
<br />20 3 EA Adjust Water Valve Pot Frame
<br />and Cover to Grade
<br />TOTAL BASE BID:
<br />SUBCONTRACTORS:
<br />SECURITIES:
<br />NOTES:
<br />$2,500.00
<br />$2,500.00
<br />$5,000.00
<br />$5,000.00
<br />$50.00
<br />$2,000.00
<br />$75.00
<br />$3,000.00
<br />$1,500.00
<br />$4,500.00
<br />$500.00
<br />$1,500.00
<br />$100.00
<br />$8,000.00
<br />$450.00
<br />$36,000.00
<br />$650.00
<br />$1,950.00
<br />$500.00
<br />$1,500.00
<br />$317,187.23
<br />$394,475.00
<br />UNIT COST
<br />lChrisp Co., JJR
<br />10% Bid Bond
<br />$8,200.00
<br />$187.00 $7,480.00
<br />$1,250.00 $3,750.00
<br />$305.001 $24,400.00
<br />$350.00 $1,050.00
<br />$2,500.00
<br />$2,500.00
<br />$70.00
<br />$2,800.00
<br />$1,000,001
<br />$3,000.00
<br />$165.00( $13,200.00
<br />$650.001 $1,950.00
<br />Integrity Data & Fiber, Chrisp Chrisp Company
<br />Company, Sposei Engineering,
<br />Inc.
<br />10% Bid Bond 10% Bid'Bond
<br />Reviewed by:
<br />Nelso am, Project Manager
<br />Reviewed by:
<br />A ' e Osakwe, Senior Engineer
<br />Bid Summary.xlsx
<br />ENGINEER'S ESTIMATE
<br />St. Francis Electric
<br />Steiny and Company, Inc.
<br />Prism Engineering, Inc.
<br />Date Approved: 111712011
<br />975 Carden Street
<br />27 Sheridan Street
<br />23953 Saklan Road
<br />Prepared by: NIL
<br />San Leandro, CA 94577
<br />Vallejo, CA 94590
<br />Hayward, CA 94545
<br />Phone: 510 -639 -0639
<br />Phone: 707 -552 -6900
<br />Phone: 510-782-4100
<br />Fax: 510-639-4656
<br />Fax: 707 -552 -7705
<br />Fax: 510-782-4102
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST I
<br />UNIT COST
<br />ITEM COST
<br />$2,000.00
<br />$2,000.00
<br />$10,000.00
<br />$10,000.00
<br />$8,500.00
<br />$8,500.00
<br />$1,500.00
<br />$1,500.00
<br />$5,000.00
<br />$5,000.00
<br />$20 ,000.00
<br />$20,000.00
<br />$17,000.00
<br />$17,000.00
<br />$2,000.00
<br />$2,000.00
<br />Date:
<br />Date: r IZ
<br />Page 4 of 6
<br />Printed 1/1212012 @ 9:00 AM
<br />
|