Laserfiche WebLink
Project Summary <br />Project <br />Status <br />East 141h St Utility Undergrounding Design <br />(1501h to Blossom Way) <br />Americans With Disabilities Act (ADA) Ramps 11-12 1 Construction <br />1360 Ave./Bancroft Ave. Intersection Signalization Construction <br />Awarded <br />Redundant Fiber Ring <br />Design <br />Annual Street Sealing 2011-2012 1 Design <br />Marina Park Picnic Area Improvements ]_Design <br />On-going Construction <br />■ Estudillo Callan Garage <br />• Four -Story Parking Structure <br />• Start of Construction — November 20, 2010 <br />• Current Work Status — Utilities and Finishes <br />• Estimated Completion — Fall 2012 <br />2/23/2012 <br />2 <br />