Laserfiche WebLink
SAN LEANDRO ADMINISTRATIVE CODE <br />TITLE 6, Chapter 4 <br />FINANCE <br />FISCAL YEAR 2013 PROPOSED FEES <br />§6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general laws of the State of California. <br />:E SERVICE REL - GENER <br />1 Permits <br />A. Fire Code Permit Fees <br />2 Sprinkler Fees: <br />A. Underground /Private Service Fire Main (includes plan review, hydrostatic test, flush, & <br />inspections <2 <br />B. Sprinkler System (system = 1 riser) (includes plan review, weld, hydrostatic test & <br />inspection <2 <br />C. Any extraordinary si tuations ch arged at <br />D. Automatic Sprinkler Ten I mprovem ents: <br />-- Less than 20 heads <br />-- Greater than or equal to 20 heads <br />3 Fixed Fire Protection System <br />A. Plan check, inspection and test <br />B. Electro activation (c lean age nt, pre action, etc.) <br />C. Any rete or re- inspect (1) <br />4 Fire Alarms <br />A. Property protectio plan check and test <br />B. Life Safety System <br />C. Automatic Closing Fire Assembly <br />D. Any retest or re- inspection (1) <br />ZZAINNINK <br />5 Hazardous Materials Response and Other Incident Fees <br />A. Engine or Truck Company <br />B. De puty or Battalion Chief <br />6 Inspe ction of Multiple Family Dwellings (3 or more units) <br />A. Annual <br />7 Miscellaneous <br />A. All other plan reviews (includes review and ordinary inspections associated with <br />B. Other Fire Prevention Services (includes any miscellaneous fire protection related <br />activities not otherwise categorized in this fee schedule <br />C. Fire Inve stigation Fee <br />D. Plannina Review Fee (Site plans & CUP) <br />'.SLMC 3 -3 -112 <br />$217 <br />$ 223.00 CPI <br />'SLMC 3 -3 -260 <br />$590.00 total $575 plus $15 /hydrant or <br />$605.00 total CPI <br />connection fee <br />$590.00... <br />$590 plus $0.50 per head <br />$605.00 ... CPI <br />$108.00 /hr. <br />$111.00/hr CPI <br />$217 <br />$ 223.00 CPI <br />$325.00 plus $.50 per head <br />$333.00 ... CPI <br />SLMC 3 -3 -250 <br />$217.00 <br />$ 223.00 I CPI <br />$325.00 plus $5 per device <br />$333.00 ... CPI <br />$108.00 <br />$111.001hr ICPI <br />ySLMC 3 -3 -250 <br />$217.00 plus $5 per device <br />$223.00 ... CPI <br />$108 plus $3 / initiating and /or indicting device <br />$ 111.00... CPI <br />$108.00 /hr. <br />$111.001hr CPI <br />SLMC 3 -3 -300 <br />$262.00/hr <br />$269.00 1 hr. CPI <br />$97.00 /hr. <br />$100.00 1hr. CPI <br />CA Health & Safety <br />Code <br />Annual $108.00/hr (1) <br />Annual CPI <br />■ <br />$11 1.001hr (1) <br />$217.00 plus 65% of bldg permit fee(2) <br />$223.00... CPI <br />Direct Cost (2) (3) <br />$542 <br />$ 556 .00 CPI <br />$217 <br />$ 223.0 CPI <br />1(2) The City Manager and /or Fire Chief may adjust the plan checking /permit fee for an individual project when costs to the City are not congruent with this fee schedule. I <br />UMAN RESOURCES DEPARTMENT <br />No fees are charaed by this depart <br />20 <br />