Laserfiche WebLink
SAN LEANDRO ADMINISTRATIVE CODE FINANCE <br />TITLE 6, Chapter 4 FISCAL YEAR 2013 PROPOSED FEES <br />§6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general laws of the State of California. <br />Description <br />Current Fee <br />Reference Proposed Fee Exp lanation of Propo Fee Chang for 2012 -13 <br />PUBLIC W ORKS SERVICES DEPARTMENT- Environmental Services Division <br />1 Haza Materi Storage <br />'.SLMC 3 -3 -300 <br />Environmental Services Fees increase by CPI unless otherwise noted <br />A. Annual fees for storage of combustible liquids, corrosives, flammable gases, <br />Quantity Range 1 $ 102.00 (2) <br />... $105.00 <br />flammable liquids, flammable solids, nonflammable gases, organic peroxides, other <br />regulated materials, oxidizers, poisonous gasses, poisonous materials (1) <br />Quantity Range 2 $204.00 <br />... $209 Ratio from Quantity 1 fee CPI Increase <br />Quantity Range 3 $295.00 <br />... $302 Ratio from Quantity 1 fee CPl Increase <br />Quantity Range 4 $386.00 <br />... $ 395 Ratio from Quantity 1 fee CPl Increase <br />Quantity Range 5 $482.00 <br />... $494 Ratio from Quantity 1 fee CPl Increase <br />B. Annu Fee for Storage of Radioactive Materials (1) <br />$142.00 <br />$ <br />146 .00 CPI <br />C. Aboveground Tank Installation Permit (3) <br />I <br />I <br />Tank <br />$295.00 <br />I $ <br />770.00 IRegu latory changes increased time required (based on 6 hours x 128.251hr) <br />_First <br />Each Additional <br />$102.00 <br />I $ <br />257.00 I Regu latory changes increased time required (based on 2 hours x 128.251hr) <br />D. A PSA Facility Annual Fee <br />I <br />I <br />Qualified Facility (Tier Iffier II) <br />$125.00 <br />I $ <br />128.00 I CPI <br />Non - Qualified Facility (full SPCC) <br />$220.00 <br />I $ <br />226.00 I CPI <br />2 Accidental Release Program: Review of RMP by: <br />SLMC 3 -37300 I <br />I <br />City Staff <br />$125.00/hr. <br />= I $ <br />128 .00 ICPI <br />Outside consultant <br />Direct Costs plus 10% <br />I <br />I <br />Annual Fee <br />$125.9 <br />I <br />I <br />Program 1 <br />I $ <br />500.00 I Tiered fee replacing annual fee to recover annualized <br />Progra 2 <br />I $ <br />650.00 I pr ogram costs <br />Program 3 <br />= I $ <br />800.00 I <br />3 Underground Hazardous Materials St orage <br />SLMC 3 -3 -300 I <br />I <br />A. Annual Operating Permit (4): Each Tank <br />$107.00 <br />I $ <br />110 .00 I CPI <br />B. New T ank Installation (5) <br />I <br />First Tank <br />$817.00 <br />$ <br />2,309.00 I Regul atory changes increased time required (based on 18 hours x 128.25 <br />Eac Additional ` <br />$199.00 <br />$ <br />257.00 I Regul atory changes increased time required (based on 2 hours x 128.251hr) <br />C. Tank Re moval, Repa Alterations (6) <br />Firs Tank <br />$397.00 <br />7 7 1,283.00 <br />I Regul atory changes increased time required (based on 10 hours x 128.25 <br />Each Additional <br />$199.00 <br />$ <br />205 I Regul atory changes increased time required (based on 1.6 hours x 128.251hr) <br />D. Minor Repairs and Alterations Hourly Rate <br />$125.00 <br />$ <br />128.00 I CPI <br />4 Conta minated Site Cleanup Program <br />A. Oversight of Remedial Investigations and Actions <br />City Staff Hourly Rate <br />$125.00/hr. <br />$ <br />128.00 JCPI <br />Outside Consultant <br />Direct Costs plus 10% <br />(1) ilincludes hermit nrocessind and two insnections annually tone annual and one re- inspection) for comnliance with the Uniform Fire Code. review <br />of the HMBP. and review of all emeroencv resnonse plans <br />(3) linclucles plan review, tield inspections, and permit processing. Time for inspections is two hours for the tirst tank and one hour each additional tank. Additional inspections will be charged at the current hourly rate. <br />(4) jincludes permit processing and two inspections annually (one annual and one re- inspection) for compliance with applicable federal and state underground tank and /or hazardous <br />waste laws and regulations and /or the Uniform Fire Code. Additional inspections will be charged at the current hourly rate. <br />(5) Includes plan review, field inspections, and permit processing. Time for inspections is four houns for the first tank and hi houns ich additional tan Additional inspectic t ime will be charged at the current hourly rate. <br />(6) Includes plan review, field inspections, and permit processing. Time for inspections is four houns for the first tank and hi houns ich additional tan Additional inspections time will be charged at the current hourly rate. <br />