SAN LEANDRO ADMINISTRATIVE CODE
<br />TITLE 6, Chapter 4
<br />FINANCE
<br />FISCAL YEAR 2013 PROPOSED FEES
<br />§6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general laws of the State of California.
<br />Description
<br />Current Fee Reference
<br />Pro osed Fee
<br />Explanation of Propo Fee Chang for 2012 -13
<br />COMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division
<br />1
<br />Plans and Specifications
<br />See Engineering & Transportation Department
<br />Item 7 Public Work Protects
<br />2
<br />Building Permit
<br />NOTE: FEES FOR BUILDING PERMITS AND TERMITE REPAIR WORK DO NOT INCLUDE THE STRONG MOTION (EARTHQUAKE)
<br />A. Filing and Issuance Fee
<br />$88 plus valuation fees and /or other building fees
<br />$90 plus...
<br />CPI
<br />as listed below
<br />Re- filing Fee for each resubmittal, deferred submittal, and /or revision after the 1 at
<br />I50 of Filing and Issuance Fee per occurrence
<br />resubmittal , or upon the 2nd resubmittal for plan check on the same project
<br />Minimum fee for one inspection
<br />Included in the Issue and Filing Fee
<br />CPI
<br />Building Permits requiring more than one inspection, other than for those requiring $134.00
<br />$ 137.00
<br />return inspectio for corrections from a previous insp ection, ha ve a minimum fee o f:
<br />All- Inclusive Permit: Work involving a combination of building and /or mechanical, One filing and issuance fee plus Items from
<br />electrical and plumbing, with a value of less than $3,000:
<br />respective fee tables
<br />Residential Seismic Retrofit projects using "Planset A" (for one and two family
<br />$75.00 plus Filing and Issuance Fee and other
<br />$77 plus...
<br />CPI
<br />residences )
<br />Permits involving plan check, inspections, and verification per OSHPD3 requirements.
<br />miscellaneous fees
<br />125% of normal Building Permit Fee. Plan check
<br />fee shall be calculated based on this increased
<br />fee.
<br />New Commercial /Industrial Buildings 10,000 sq. ft. or more (additional time for plan
<br />125% of standard Building Permit Fee
<br />review, inspections, and verification of code requirements
<br />Tier 1 Certification (additional time for plan review, inspections, and verification of code
<br />130% of standard Building Permit Fee
<br />requirements)
<br />Tier 2 Certification (additional time for plan review, inspections, and verification of code
<br />135% of standard Building Permit Fee
<br />requirements
<br />(Note: The Building Official may adjust the plan checking /permit fee for an individual project when costs to the City are not congruent with this fee schedule.)
<br />Total Valuation (Based on total value of all construction work, as determined by the Building Official, including all finish work, roofing, electrical,
<br />plumbing, heating, air conditioning, elevators, fire - extinguishing systems and any other permanent
<br />equipment.)
<br />From - To and Including
<br />$1.00- $4,000
<br />$134.00
<br />I $ T 137.00 IC PI
<br />$4,001.00 - $50,000.00
<br />$134.00 for the first $4,000.00 plus $13.20 for each
<br />$13200 Cpl
<br />additional $1,000 or fraction thereof, to and
<br />$4,000.00 plus
<br />including $50,000
<br />$13.54...
<br />$50,001.00- $100,000.00
<br />$740.00 for the first $50,000 plus $9.25 for each
<br />$759.00... first Cpl
<br />additional $1,000 or fraction thereof, to and
<br />$50,000 plus
<br />including $100,000.00
<br />$9.49....
<br />$100,001.00 - $500,000.00
<br />$1,202.00 for the first $100,000 plus $5.27 for each
<br />$1,233.00... Cpl
<br />additional $1,000 or fraction thereof, to and
<br />first $100,000
<br />including $500,000.00
<br />plus $5.40...
<br />$500,001.00 - $1,000,000.00
<br />$3,311.00 for the first $500,000 plus $4.97 for each
<br />$3,397.00... Cpl
<br />additional $1,000 or fraction thereof, to and
<br />first $500,000
<br />including $1,000,000.00
<br />plus $5.10...
<br />$1,000,001.00 and up
<br />$5,795.00 for the first $1,000,000 plus $4.15 for
<br />$5,946.00 1 Cpl
<br />each additional $1,000 or fraction thereof, to and
<br />$1,000,000
<br />inclu $1,000,000.00 )
<br />plus $4.26 ...
<br />B. Termite Repair Work
<br />$88. plus total valuation as listed above
<br />I $90 plu s... ICPI
<br />$0.00- $3,000
<br />$134.0
<br />I $ 137.00 ICPI
<br />Over $3,000
<br />Same as for other building permits, minimum of
<br />$134.00
<br />...minimum of CPI
<br />$137.00
<br />C. Satellite Dish Antenna
<br />$134.00
<br />_
<br />I $ 137.00 ICPI
<br />D. Minor Kitchen Remodel Permit:
<br />a.Single kitchen or bath remodel (permitto
<br />...$345.00 CPI
<br />include electrical, plumbing, mechanical
<br />ventilation and appliances) $336.00
<br />(Limited to work withoutframing changes.) b. Additional bath remodel when concurrentwith
<br />...$143.00 CPI
<br />kitchen or bath remodel within the same structure
<br />and at same time $139.00
<br />E. Plan Checking
<br />Plan checking fee shall be paid at the time of application for a building permit. The plan
<br />checking fee is in addition to the building permit fee and shall be as follo
<br />(1) Residential Fire Sprinklers for 1 & 2 Family Dwelling New Construction
<br />Effective January 1, 2011, fire sprinkler systems became mandatory in 1 and 2
<br />family dwellings. The Division of Building and Safety will be reviewing and
<br />inspecting the installation of these systems.
<br />$456.00 flat fee to include plan review and
<br />inspection of residential fire sprinkler systems
<br />when installed in conjunction with new 1 & 2
<br />family dwelling construction.
<br />I
<br />$468.00 flat CPI
<br />fee....
<br />
|