My WebLink
|
Help
|
About
|
Sign Out
Home
Finance Highlights 2012 0406
CityHall
>
City Clerk
>
City Council
>
Committees
>
Finance Committee
>
Finance Highlights 2012 0406
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2012 3:35:49 PM
Creation date
5/1/2012 3:34:06 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Committee Highlights
Document Date (6)
4/6/2012
Retention
PERM
Document Relationships
_CC Agenda 2012 0507 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2012\Packet 2012 0507
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4/4/2012 <br />Transportation Projects (continued) <br />Annual Sidewalk Repair Program (35) <br />— Inspect and repair sidewalks, repair curb and gutter, and construct <br />Americans with Disabilities Act (ADA)- compliant ramps <br />— Estimated Cost — $436,400 <br />— Funding: <br />• $225,180 Measure B Streets & Roads <br />• $125,089 Measure B Bicycle & Pedestrian <br />• $31,139 Community Development Block Grant <br />• $55,000 Transportation Development Act (TDA) Grant <br />® Bicycle Network (East) Connection (31 tied) <br />— Install bike lanes, markings, and signage east of the Union Pacific <br />Railroad Niles Subdivision <br />— Estimated Cost — $500,940 <br />— Funding: <br />• $500,940 Measure B Bicycle & Pedestrian <br />z <br />Transportation Projects (continued) <br />Miscellaneous Traffic Studies, Advanced Planning, and Safety / <br />Signal Equipment (11) <br />— Traffic - related planning activities and installation of various signal <br />improvements <br />— Estimated Cost: $20,000 <br />— Funding: <br />• $20,000 Developer Fees for Street Improvement <br />® Annual Bicycle and Pedestrian Improvements (12) <br />— Support programs identified in City's Bicycle and Pedestrian Master <br />Plan <br />— Estimated Cost: $60,000 <br />— Funding: <br />• $60,000 Measure B Bicycle & Pedestrian <br />28 <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.