Laserfiche WebLink
4/4/2012 <br />Environmental Hazard Projects (continued) <br />Sanitary Sewer Capacity Study and Master Plan (21 tied) <br />- Conduct a study of the sanitary sewer system caaacity for kev <br />system elements under peak flow conditions. Last study <br />conducted in 1993 <br />- Estimated Cost - $450,000 <br />- Funding: <br />• $450,000 Water Pollution Control Enterprise Funds <br />CCTV Truck, Equipment, and Systems Replacement (25 tied) <br />- Purchase of a Closed Circuit Television (CCTV) truck and <br />equipment necessary for sewer collection system inspections <br />- Estimated Cost - $293,000 <br />- Funding: <br />• $293,000 Water Pollution Control Enterprise Funds <br />31 <br />Environmental Hazard Projects (continued) <br />- Sanitary Sewer Line Replacement / Repair (12 tied) <br />- Repair or replace segments of the sanitary sewer collection system <br />based on condition inspections <br />- Estimated Cost - $500,000 <br />Funding: <br />• $500,000 Water Pollution Control Enterprise Funds <br />32 <br />16 <br />