Laserfiche WebLink
4/4/2012 <br />Computers and Technology Projects <br />Fiber Optic Loop Separation (4) <br />— irriproving redundancy in the City's fiber network by constructing a <br />separate fiber optic line between the City Hall and Main Library <br />— Estimated Cost — $120,000 <br />— Funding: <br />$60,000 Developer Fees for Street Improvements <br />$60,000 General Fund <br />35 <br />Miscellaneous Projects <br />s Miscellaneous Engineering Studies (36 tied) <br />- Fund design studies, grant applications, or other engineering support <br />requests <br />- Estimated Cost - $50,000 <br />- Funding: <br />• $50,000 General Fund <br />36 <br />IN <br />