My WebLink
|
Help
|
About
|
Sign Out
Home
8L Consent 2012 0507
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2012
>
Packet 2012 0507
>
8L Consent 2012 0507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2012 4:15:24 PM
Creation date
5/1/2012 3:42:24 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/7/2012
Retention
PERM
Document Relationships
_CC Agenda 2012 0507 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2012\Packet 2012 0507
Reso 2012-042
(Reference)
Path:
\City Clerk\City Council\Resolutions\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File Number: 12 -163 <br />The TDA funds will be used to fund a project that will install the following: handicap ramps; <br />sidewalk; sidewalk bulb -outs; pedestrian safety signage; accessible pedestrian traffic signals; <br />and lighted crosswalks at various locations citywide. The project work is typically completed <br />as part of the City's Annual Sidewalk Program. <br />Previous Actions <br />The City Council annually authorizes staff to apply for these funds <br />On May 16, 2011, by Resolution No. 2011 -089, the City Council authorized the filing of a <br />claim with the MTC for allocation of TDA Article 3 funds for FY 2011 -12 <br />Applicable General Plan Policies <br />This project is consistent with the Bicycle and Pedestrian Goal (14) of the General Plan and <br />Action 14.07 -B: Pedestrian and Bicycle Crossing Improvements. <br />Environmental Review <br />This project is Categorically Exempt from the CEQA process. <br />Fiscal Impacts <br />$66,202 is the amount the City is eligible to apply for in FY 2012 -13, and there is no required <br />match. Grant funds will need to be appropriated and will be reimbursed once all of the <br />spending is complete (within a three -year period). <br />Budget Authority <br />$66,202 is the amount the City is eligible to apply for in FY 2012 -13. The request for the <br />appropriation of funds will be included in the CIP Budget for FY 2012 -13. <br />ATTACHMENTS <br />None. <br />PREPARED BY: Keith R. Cooke, Principal Engineer, Engineering and Transportation <br />Department <br />City of San Leandro Page 2 Printed on 51112012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.