My WebLink
|
Help
|
About
|
Sign Out
Home
8L Consent 2012 0507
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2012
>
Packet 2012 0507
>
8L Consent 2012 0507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2012 4:15:24 PM
Creation date
5/1/2012 3:42:24 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/7/2012
Retention
PERM
Document Relationships
_CC Agenda 2012 0507 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2012\Packet 2012 0507
Reso 2012-042
(Reference)
Path:
\City Clerk\City Council\Resolutions\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution No. 2012- <br />Attachment A <br />Findings <br />Page 1 of <br />1. That the City of San Leandro is not legally impeded from submitting a request to <br />the Metropolitan Transportation Commission for the allocation of Transportation <br />Development Act (TDA) Article 3 funds, nor is the City of San Leandro legally <br />impeded from undertaking the project(s) described in "Attachment B" of this <br />resolution. <br />2. That the City of San Leandro has committed adequate staffing resources to <br />complete the project(s) described in Attachment B. <br />3. A review of the project(s) described in Attachment B has resulted in the <br />consideration of all pertinent matters, including those related to environmental and <br />right -of -way permits and clearances, attendant to the successful completion of the <br />project(s). <br />4. Issues attendant to securing environmental and right -of -way permits and clearances <br />for the projects described in Attachment B have been reviewed and will be <br />concluded in a manner and on a schedule that will not jeopardize the deadline for <br />the use of the TDA funds being requested. <br />5. That the project(s) described in Attachment B comply with the requirements of the <br />California Environmental Quality Act (CEQA) (Public Resources Code Sections <br />21000 et seq.). <br />6. That as portrayed in the budgetary description(s) of the project(s) in Attachment B, <br />the sources of funding other than TDA are assured and adequate for completion of <br />the project(s). <br />7. That the project(s) described in Attachment B are for capital construction and /or <br />design engineering; and /or for the maintenance of a Class I bikeway, which is closed <br />to motorized traffic; and /or for the purposes of restriping Class II bicycle lanes; <br />and /or for the development or support of a bicycle safety education program; and /or <br />for the development of a comprehensive bicycle and /or pedestrian facilities plan; and <br />an allocation of TDA Article 3 funding for such a plan has not been received by the <br />City of San Leandro within the prior five fiscal years. <br />8. That the project(s) described in Attachment B which are bicycle projects have been <br />included in a detailed bicycle circulation element included in an adopted general <br />plan, or included in an adopted comprehensive bikeway plan (such as outlined in <br />Section 2377 of the California Bikeways Act, Streets and Highways Code section <br />2370 et seq. ). <br />9. That any project described in Attachment B that is a "Class I Bikeway," meets the <br />mandatory minimum safety design criteria published in Chapter 1000 of the <br />California Highway Design Manual. <br />
The URL can be used to link to this page
Your browser does not support the video tag.