My WebLink
|
Help
|
About
|
Sign Out
Home
8L Consent 2012 0507
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2012
>
Packet 2012 0507
>
8L Consent 2012 0507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2012 4:15:24 PM
Creation date
5/1/2012 3:42:24 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/7/2012
Retention
PERM
Document Relationships
_CC Agenda 2012 0507 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2012\Packet 2012 0507
Reso 2012-042
(Reference)
Path:
\City Clerk\City Council\Resolutions\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution No. 2012 - <br />Attachment B <br />Page IofI <br />TDA Article 3 Project Application Form <br />Fiscal Year of this Claim: 12/13 Applicant: City of San Leandro <br />Contact person: Keith R. Cooke <br />Mailing Address: 835 East 14th Street, San Leandro, CA 94577 <br />E -Mail Address: kcooke a(�sanleandro.org Telephone: (510) 577 -3439 <br />Secondary Contact (in event primary not available) Tara Peterson <br />E -Mail Address: tpeterson a( sanleandro.org Telephone: (510) 577 -3432 <br />Short Title Description of Project: Citywide Pedestrian Accessibility Improvements 12113 <br />Amount of claim: $66.202.00 <br />Functional Description of Project: <br />Protect will provide for the design, construction and inspection of curb ramps, sidewalk bulb -outs, in- pavement lighted crosswalk, pedestrian safety <br />signage, accessible pedestrian traffic signal equipment and sidewalks at various locations throughout City. <br />Financial Plan: <br />List the project elements for which TDA funding is being requested (e.g., planning, environmental, engineering, right -of -way, construction, <br />inspection, contingency, audit). Use the table below to show the project budget. Include prior and proposed future funding of the project. If the <br />project is a segment of a larger project, include prior and proposed funding sources for the other segments. <br />Project Elements: Engineering, Construction and Inspection <br />Funding Source <br />All Prior FYs <br />Application FY <br />Next FY <br />Following FYs <br />Totals <br />TDA Article 3 <br />No <br />$66,202 <br />For "bikeways," does the project meet Caltrans minimum safety design criteria pursuant to Chapter 1000 of the California <br />Highway Design Manual? (Available on the internet via: http: / /www.dot.ca.gov <br />N/A <br />$66,202 <br />list all other sources: <br />Yes <br />E. <br />Has the public availability of the environmental compliance documentation for the project (pursuant to CEQA) been <br />evidenced by the dated stamping of the document by the county clerk or county recorder? (required only for projects that <br />include construction). <br />N/A <br />F. <br />1. <br />Yes <br />G. <br />Have provisions been made by the claimant to maintain the project or facility, or has the claimant arranged for such <br />maintenance by another agency? (If an agency other than the Claimant is to maintain the facility provide its name: <br />Yes <br />2. <br />3. <br />4. <br />Totals <br />$66,202 <br />Project Eligibility: <br />YES ?INO? <br />A. <br />Has the project been approved by the claimant's governing body? (If "NO," provide the approximate date approval is <br />anticipated). <br />Yes <br />B. <br />Has this project previously received TDA Article 3 funding? If "YES," provide an explanation on a separate page. <br />No <br />C. <br />For "bikeways," does the project meet Caltrans minimum safety design criteria pursuant to Chapter 1000 of the California <br />Highway Design Manual? (Available on the internet via: http: / /www.dot.ca.gov <br />N/A <br />D. <br />Has the project been reviewed by a Bicycle Advisory Committee? (If "NO," provide an explanation). <br />Yes <br />E. <br />Has the public availability of the environmental compliance documentation for the project (pursuant to CEQA) been <br />evidenced by the dated stamping of the document by the county clerk or county recorder? (required only for projects that <br />include construction). <br />N/A <br />F. <br />Will the project be completed before the allocation expires? Enter the anticipated completion date of project (month and <br />year) June 2014 <br />Yes <br />G. <br />Have provisions been made by the claimant to maintain the project or facility, or has the claimant arranged for such <br />maintenance by another agency? (If an agency other than the Claimant is to maintain the facility provide its name: <br />Yes <br />
The URL can be used to link to this page
Your browser does not support the video tag.