Laserfiche WebLink
• <br /> reservations, or other exactions imposed on this Project by these Conditions of <br /> Approval) will begin on the date of the conditional approval of this Project. If you <br /> fail to file a protest within this 90 -day period, complying with all of the <br /> requirements of Government Code Section 66020, you will be legally barred from <br /> later challenging any such fees, dedications, reservations or other exactions. <br /> C. Site improvement Plans for all on -site and off -site improvements shall be approved <br /> by the City Engineer prior to the issuance of Building Permits for the project. All <br /> improvements shall be designed and constructed in accordance with the City's <br /> Design Standards, Specifications and Standard Plans, unless otherwise specifically <br /> approved by the City Engineer. <br /> D. Prior to the issuance of the Building Permit, the property owner shall pay the <br /> Underground Sewer Connection fee, Engineering Review and Inspection Fees, as <br /> required by City Ordinances and regulations. <br /> E. A Development Fee for Street Improvements (DFSI) is required for each housing <br /> unit. However, a credit for the existing 43,200 square feet of office space offsets this <br /> fee and therefore, no fee is payable. <br /> F. Applicant shall pay a Park Facilities Development Impact Fee of prior to issuance of <br /> a building permit. A credit for land dedicated to recreational space will be assessed. <br /> Credit is offered for public spaces at 100% of value, for private spaces with heavy <br /> use at 50% of value, for private space with light use at 25% of value. The <br /> determination on the use of space is based solely on the judgment of the City <br /> Engineer or his designee. <br /> G. Applicant shall pay an Underground utility fee prior to approval of the final map. <br /> H. Applicant shall remove any broken and uplifted driveway, sidewalk, curb and gutter <br /> along the full project frontage and shall construct new City standard driveway, <br /> sidewalk, curb and gutter in the sane location and alignment as the existing <br /> facilities prior to issuance Certificate of Occupancy. <br /> I. All abandoned driveways shall be removed anti replaced with City standard <br /> sidewalk, curb and gutter prior to issuance of Certificate of Occupancy. <br /> J. Prior to the issuance of building permits for the project, the Applicant shall obtain <br /> an Encroachment Permit from the Engineering and Transportation Department for <br /> any work within the public right -of -way. <br /> K. Applicant shall obtain an encroachment permit from Oro Loma Sanitary District <br /> sewer line connection prior to issuance of building permit. <br /> Agreement to Conditions October 20, 2011 <br /> PLN2009 -00006 Page 7 of 21 <br />