SAN LEANDRO ADMINISTRATIVE CODE FINANCE
<br />TITLE 6, Chapter 4 FISCAL YEAR 2013 Adopted FEES
<br />§6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general laws of the State of California.
<br />PUBLIC WORKS SERVICES DEPARTMENT — Environmental Services Division
<br />1 _Hazardous Materials Storage
<br />SLMC 3 -3 -300
<br />A. Annual fees for storage of combustible liquids, corrosives, flammable gases,
<br />€Quantity Range 1 $ 105.00 (2)
<br />;flammable liquids, flammable solids, nonflammable gases, organic peroxides, other
<br />regulated materials, oxidizers, poisonous gasses, poisonous materials (1)
<br />,$128.00
<br />Non - Qualified Facility (full SPCC)
<br />, Quantity Range 2 $209.00
<br />2 _Accidental Release Program: Review of RMP by:
<br />Quantity Range 3 $302.00
<br />City Staff
<br />Quantity Range 4 $395.00
<br />Outside consultant
<br />Quantity Range 5 $494.00 _
<br />C. Aboveground Tank Installation Permit (3)
<br />First Tank
<br />$770.00
<br />Each Additional
<br />$257.00
<br />D. APSA Facility Annual Fee
<br />Qualified Facility (Tier Iffier II)
<br />,$128.00
<br />Non - Qualified Facility (full SPCC)
<br />$226.00
<br />2 _Accidental Release Program: Review of RMP by:
<br />City Staff
<br />1$128.00 /hour
<br />Outside consultant
<br />_Direct Costs I
<br />Annual Fee
<br />Program 1
<br />:$500.00
<br />Program 2
<br />,$650.00
<br />Program 3
<br />€$800.00
<br />3 jUnderground Hazardous Materials Storage
<br />Annual Operating Permit (4): Each Tank
<br />[$110.00
<br />I A
<br />B. New Tank Installation (5)
<br />First Tank
<br />$2,309.00
<br />Each Additional
<br />,$257.00
<br />C. Tank Removal, Repair, Alterations (6)
<br />First Tank
<br />€$1,283.00
<br />Each Additional
<br />€$205.00
<br />D. Minor Repairs and Alterations Hourly Rate
<br />_$128.00 /hour
<br />41Contaminated Site Cleanup Program
<br />_
<br />Outside Consultant Direct Costs plus 10
<br />Dermit orocessim and two insoections annually tone annual and one re- insoection) for comoliance with
<br />C 3 -3 -300
<br />I Quantity Range 3 Greater than 5,000 pounds, 550 gallons, or 20,000 cubic feet at STP, but less than or equal to 50,000 pounds, 5,500 gallons or 200,000 cubic feet at STP, respectively.
<br />Quantity Range 4 Greater than 50,000 pounds, 5,500 gallons, or 200,000 cubic feet at STP, but less than or equal to 500,000 pounds, 55,000 gallons, or 2,000,000 cubic feet at STP, respectively.
<br />Quantity Range 5 Greater than 500,000 pounds, 55,000 gallons, or 2,000,000 cubic feet at STP.
<br />(3) . `Includes plan review, field inspections, and permit processing. Time for inspections is two hours for the first tank and one hour each additional tank. Additional inspections will be charged at the current hourly rate.
<br />(4) `Includes permit processing and two inspections annually (one annual and one re- inspection) for compliance with applicable federal and state underground tank and /or hazardous
<br />_waste laws and regulations and /or the Uniform Fire Code. Additional inspections will be charged at the current hourly rate.
<br />(5) - Includes plan review, field inspections, and permit processinq. Additional time will be charged at the current hourly rate.
<br />G: \FEES\2012 -13 Fees \2013 Adopted Master Fee Schedule 24 6/82012
<br />
|