Laserfiche WebLink
SAN LEANDRO ADMINISTRATIVE CODE FINANCE <br />TITLE 6, Chapter 4 FISCAL YEAR 2013 Adopted FEES <br />§6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general laws of the State of California. <br />COMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division (continued);. <br />1$4.46 <br />3 _Electrical Permit (Continued) <br />Up to and including 1 h.p. <br />Fixed Residential Appliances (connection on new or existing circuits): <br />1.1 h.p. to 10 h.p. <br />Electric range, dryer, combination washer and dryer, furnace, water heater, etc., <br />10.1 h.p. to 13 h.p. <br />Heaters (air, water and other kinds), furnaces and welding machines: For each <br />DW or kVA and fraction of either. <br />Up to and including 20kW or kVA $21.85 <br />l$40.07 <br />JOver 20kW or kVA to and including 50kW or kVA $53.71 <br />:$48.22 <br />10ver 50kW or kVA to and including 80 kW or kVA $86.0: <br />=$55.40 <br />JOver80kW or kVA $106.14 <br />-Fixed commercial appliances (connection on new or existing circuits) not exceeding 1 HP, <br />?kW or kVA: <br />25.1 h.p. to 28 h.p. <br />Medical /dal equipment, food cabinets, showcases, laundry machines, motion picture <br />)machi ent <br />nes specialty lighting etc.) <br />j$10.41 <br />- Fire protection systems, otherthan smoke detectors <br />$15.03 <br />Smoke detectors <br />1$4.46 <br />Motors, including starting and controlling apparatus therefore and wiring between same and motor <br />Up to and including 1 h.p. <br />_$4.36 <br />1.1 h.p. to 10 h.p. <br />_$10.41 <br />10.1 h.p. to 13 h.p. <br />_$32.83 <br />13.1 h.p. to 16 h.p. <br />l$40.07 <br />16.1 h.p. to 19 h.p. <br />:$48.22 <br />19.1 h.p. to 22 h.p. <br />=$55.40 <br />22.1 h.p. to 25 h.p. <br />=$62.84 <br />25.1 h.p. to 28 h.p. <br />;$70.43 <br />Above 34 h.p. _$86.29 <br />For changes, renewals or replacement of said apparatus, where no changes in wiring are ;One -half (1/2) of the amount set forth above <br />;necessary <br />For motor generator sets, balancer sets, dvnamotors and converters, includina control 1150% of fees set forth above, with a maximum for <br />one such machine of $84.15 <br />same and generator for each rated maximum of kW or kVA, and fraction thereof: <br />1 to 20 1$21.49 <br />21 to 50 $55.61 <br />51 and above $86.29 <br />Transformers and balance coils, when not embodied in or included with apparatus for <br />1 to 20 <br />J$21.49 <br />21 to 50 <br />Photovoltaic - Commercial /Industrial 0 to 8kw <br />51 to 80 <br />1$85.82 <br />81 and above <br />J$100.39 <br />Rectifiers (mercury arc, vibrating and electrolytic) for each kW or kVA and fraction thereof: <br />Each 0 - 8kw P.V. Inverter over 1 <br />1 to 20 <br />_$21.49 <br />21 to 50 <br />_$53.40 <br />51 to 80 <br />_$81.77 <br />81 and above <br />_$95.73 <br />For inspection of alterations and changes in existing wiring, each inspection visit <br />1$27.86 <br />Photovoltaic Fees do not include Issuing and Filing Fees, Automation fees, and other mandated fees <br />Photovoltaic - Residential <br />_$30.00 (includes over - the - counter plan check) <br />Photovoltaic - Commercial /Industrial 0 to 8kw <br />€$236.00 (includes 1 hr. structural plan check, 1 hr. <br />[electrical plan check, and 1 inverter) <br />Photovoltaic - Commercial /Industrial >8 to 48kw <br />[$328.00 (includes 1- 1 /2hr. structural plan check, <br />1 hr. electrical plan check, and 1 inverter) <br />Photovoltaic - Commercial /Industrial >48kw <br />$667.00 (includes 4 hrs. structural plan check, 1 <br />hr. electrical plan check, and 1 inverter) <br />Each 0 - 8kw P.V. Inverter over 1 <br />11$21.00 <br />Each >8 - 48kw P.V. Inverter over 1 <br />J$51.00 <br />Each >48kw P.V. Inverter over 1 <br />:$82.00 <br />Energy Conservation: review of plans and /or energy forms for all buildings subject to the <br />California Energy Commission's conservation regulations (when not covered by building <br />permit) <br />=Direct Cost (1) with a minimum charge of $60.33 <br />Direct Cost = hourly personnel charqe plus a factor of 100% for frinqe benefits, overhead and indirect costs <br />G: \FEES\2012 -13 Fees \2013 Adopted Master Fee Schedule 5 6/82012 <br />