Laserfiche WebLink
SAN LEANDRO ADMINISTRATIVE CODE FINANCE <br />TITLE 6, Chapter 4 FISCAL YEAR 2013 Adopted FEES <br />§6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general laws of the State of California. <br />COMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division (continued) <br />_$15.54 <br />5 _Heating, Ventilating and Air Condition or General Mechanical (Continued) <br />_$23.03 <br />l Ventilating System for Kitchen, Bath, etc.: <br />1$29.50 <br />(Minimum (one or two systems) <br />_$10.36 <br />Each system over two <br />;$75.41 <br />;General Mechanical: <br />_ <br />Incinerators -domestic, each <br />$15.03 <br />Incinerators - commercial /industrial, each <br />_$59.00 <br />Garbage chutes, each <br />$32.01 <br />l Fire dampers, each <br />_$8.87 <br />Smog control after burners, commercial /industrial, each system <br />1$40.12 <br />_ Refrigeration system - commercial /industrial, each system <br />$51.25 <br />Condensate drain system, each inlet <br />Bo ilers: <br />To 3 h.p. each <br />_$15.54 <br />Over 3 to 15 h.p. each <br />_$23.03 <br />Over 15 to 30 h.p., each <br />1$29.50 <br />Over 30 to 50 h.p., each <br />_$44.78 <br />1 0ver50 h.p., each <br />;$75.41 <br />Heat pumps, each <br />_$23.03 <br />Cooling Systems: <br />$13.13 per sign plus $2.57 for each receptacle <br />I To 100,000 BTU each <br />_$20.31 <br />! Over 100,000 to 500,000 BTU, each <br />$32.01 <br />-Over 500,000 to 1,000,000 BTU, each <br />J$17.29 <br />J Over 1,000,000 BTU, each <br />_$52.53 <br />l Evaporative Cooler, each <br />$21.14 <br />Indus Processing Equipment: <br />Ovens, dtrial ryers, cookers, fryers, kettles, etc. each <br />1 Industrial processing exhaust systems, each system <br />;$33.35 <br />Manufactured spray booths, each <br />Energy Conservation: review of plans and /or energy forms for all buildings subject to the <br />=California Energy Commission's conservation regulations (when not covered by building <br />permit) <br />€ Direct Cost (1) with a minimum charge of $60.33 <br />6 =Signs <br />Filing and Issuance Fee <br />€$90.49 plus fees shown below. Fees for sign <br />permits are in addition to any required electrical <br />[permit fees <br />Valuation of Sign: (The valuation for permit fee purposes shall be the total cost or contract price of the sign. In the event such a cost or price <br />jis not available or does not, in the opinion of the Building Official, fairly represent the true value of the sign, the valuation shall be based on a <br />_reasonable cost estimate established by the Building Official.) <br />J $100 or less <br />No Additional Charge <br />More than $100 through $1,000 <br />j$46.84 <br />-More than $1,000 through $5,000 <br />j$46.84 for the first $1,000 plus $10.41 for each <br />ladditional $1,000 orfraction thereof <br />More than $5,000 through $20,000 <br />;$88.44 for the first $5,000 plus $11.44 for each <br />=additional $1,000 orfraction thereof <br />More than $20,000 <br />_$260 for the first $20,000 plus $10.41 for each <br />[additional $1,000 or fraction thereof <br />Plan Check, when applicable <br />80 % of Sign Permit Fee <br />Electric self - contained signs, initially installed bearing Underwriters' label of approval, <br />_$27.00 <br />each <br />Relocation or alteration of any sign electronically or mechanically, but not including <br />j$27.00 <br />replacement of tubing, transformers and such parts subject to failure; or shop <br />inspection by the local inspection department in lieu of a UL label (a local electrical <br />inspection department label of approval shall be required), each <br />Tube lighting for illumination, display or outline <br />$13.13 per sign plus $2.57 for each receptacle <br />Incandescent lamps for illumination, display or outline lighting having sign receptacles <br />J$13.13 per sign plus $0.58 for each receptacle <br />mounted within a sheet metal raceway approved for the purpose. <br />Transformers, each <br />J$17.29 <br />Direct Cost = hourly Dersonnel charae Dlus a factor of 100% for frinae benefits. overhead and indirect costs <br />G: \FEES\2012 -13 Fees \2013 Adopted Master Fee Schedule 8 6/82012 <br />