My WebLink
|
Help
|
About
|
Sign Out
Home
8L Consent 2012 0521
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2012
>
Packet 2012 0521
>
8L Consent 2012 0521
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2012 11:49:30 AM
Creation date
5/15/2012 3:31:29 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/21/2012
Retention
PERM
Document Relationships
_CC Agenda 2012 0521 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2012\Packet 2012 0521
Reso 2012-053
(Reference)
Path:
\City Clerk\City Council\Resolutions\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />Citywide Street Re- Striping <br />Bid No. 11- 12.007 <br />Scope of Work <br />This project consists of furnishing all labor, materials, equipment, and supervision to perform the <br />following: <br />Work: <br />Refresh existing striping on the attached list of City Streets*. The work for which this proposal is <br />submitted is for construction in accordance with the Standard Specifications of Public Works <br />Construction, 2006 edition and 2008 supplement hereto, adopted by the American Public Works <br />Association, Southern California Chapter, and Sections 82, 84, 84 and 86 of the May 2006 edition of <br />the California Department of Transportation (CALTRANS) Standard Specifications and the Special <br />Provisions (Technical Specifications) and Standard Plans hereto adopted by the City Engineer <br />(available at http: / /www.sanleandro.org/depts /transit/stdplan /default.asp ). <br />'All work to be paint striping only. Installation or replacement of delineators is not included in to <br />scope of work <br />Striping: <br />• Double Yellow (with painted black center) <br />• Broken Yellow <br />• White <br />-All as indicated on the Street Schedules <br />Paint: <br />• Paint specifications for quick drying yellow, black and white are attached <br />Nntes <br />This is a prevailing wage rate job <br />A California Contractor's license C -32 is required to do this work <br />Striping hours are Sunday through Thursday from 10:00 p.m. to 5:00 a.m. <br />Contractor must begin work within thirty (30) days after receiving the Notice to Proceed. <br />Contractor must give two (2) -weeks notice prior to striping. <br />Contractor is responsible for all traffic control related to the job. Traffic control must be used to <br />prevent traffic from driving on new paint. Contractor is responsible for clean -up of paint tracked by <br />11- 12.007 CITY -WIDE STREET RE- STRIPING 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.