My WebLink
|
Help
|
About
|
Sign Out
Home
8J Consent 2012 0604
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2012
>
Packet 2012 0604
>
8J Consent 2012 0604
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2012 9:32:07 AM
Creation date
5/29/2012 5:29:18 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
6/4/2012
Retention
PERM
Document Relationships
_CC Agenda 2012 0604 RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2012\Packet 2012 0604
Reso 2012-059
(Reference)
Path:
\City Clerk\City Council\Resolutions\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of San Leandro <br />Meeting Date: June 4, 2012 <br />Staff Report <br />File Number: 12 -241 Agenda Section: CONSENT CALENDAR <br />Agenda Number: 8.J. <br />TO: City Council <br />FROM: Chris Zapata <br />City Manager <br />BY: Uchenna Udemezue <br />Engineering & Transportation Director <br />FINANCE REVIEW: David Baum <br />Finance Director <br />TITLE: Staff Report for a Resolution Approving the Plans and Specifications and <br />Calling for Bids for the Asphalt Rubber Street Sealing 2011 -12 Project, Project <br />No. 11- 144 -38 -332 <br />SUMMARY AND RECOMMENDATIONS <br />This project provides for the application of preventive maintenance treatments on various <br />streets in San Leandro. The current program will concentrate primarily in the 2012 Asphalt <br />Maintenance Area. <br />Staff recommends approval of the plans and specifications and calling for bids for the subject <br />project. <br />le[•]:Cr] CzollJ 0I �7 <br />City staff conducts an annual pavement condition survey using our Pavement Maintenance <br />System to establish the condition of City streets. Based on this survey, various City streets <br />are recommended for one of three maintenance treatments: reconstruction; overlay; or <br />sealing. Sealing is the recommended treatment for streets in fairly good condition to <br />rejuvenate and prolong the life of the pavement. Sealing treatments to be used may include: <br />1) slurry seal; 2) microsurfacing; 3) scrub seal; and 4) asphalt rubber cape seal. <br />The City of San Leandro is divided into four Asphalt Maintenance Areas, which allows <br />Engineering and Transportation staff and Public Works Services staff to coordinate their <br />activities to ensure an efficient use of resources to maintain City streets. The streets <br />scheduled for this project are primarily in the 2012 Asphalt Maintenance Area (see attached <br />map). <br />All street segments associated with this project are scheduled to receive an application of <br />asphalt rubber chip seal. There are only a few contractors in California who can apply asphalt <br />rubber chip seal. Therefore, streets that are scheduled to receive non - rubberized treatments <br />City of San Leandro Page 1 Printed on 512912012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.